15/07/2026 16:48:00 : ROADWORKS
C0022, Bay Road, Crumlin, - Road Closure, C0022, Bay Road, Crumlin
Road closure required to NIE Overhead Line Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0022 CHERRYVALLEY ROAD, C0021 LURGAN ROAD, B0012 MAIN STREET, A0052 MILL ROAD, C0024 CRUMLIN ROAD, C0022 LARGY ROAD, C0022 BAY ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0022 CHERRYVALLEY ROAD, C0021 LURGAN ROAD, B0012 MAIN STREET, A0052 MILL ROAD, C0024 CRUMLIN ROAD, C0022 LARGY ROAD, C0022 BAY ROAD.
15/07/2026 16:45:00 : ROADWORKS
C0052, Staffordstown Road, Randalstown, - Road Closure, C0052, Staffordstown Road, Randalstown
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0052 STAFFORDSTOWN ROAD, A0006 MONEYNICK ROAD, C0052 DERRYGOWAN ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0052 STAFFORDSTOWN ROAD, A0006 MONEYNICK ROAD, C0052 DERRYGOWAN ROAD.
15/07/2026 16:25:00 : ROADWORKS
U1018, Mucklerammer Road, Randalstown, - Road Closure, U1018, Mucklerammer Road, Randalstown
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U1018 MUCKLERAMMER ROAD, B0052 PORTGLENONE ROAD, B0018 WHITESIDES ROAD, B0093 AHOGHILL ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U1018 MUCKLERAMMER ROAD, B0052 PORTGLENONE ROAD, B0018 WHITESIDES ROAD, B0093 AHOGHILL ROAD.
15/07/2026 16:22:00 : ROADWORKS
U1131, Dundesert Road, Crumlin, - Road Closure, U1131, Dundesert Road, Crumlin
Road closure required for NIW Water - Replace Boundary Box or Stop Cock.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A0052 NUTTS CORNER ROAD, A0026 MOIRA ROAD, A0026 TULLY ROAD Diversion 2: A0026 TULLY ROAD, C0110 TULLY ROAD, C0110 KILLEAD ROAD, U1132 TULLYWEST ROAD, A0052 NUTTS CORNER ROAD
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A0052 NUTTS CORNER ROAD, A0026 MOIRA ROAD, A0026 TULLY ROAD Diversion 2: A0026 TULLY ROAD, C0110 TULLY ROAD, C0110 KILLEAD ROAD, U1132 TULLYWEST ROAD, A0052 NUTTS CORNER ROAD
15/07/2026 16:18:00 : ROADWORKS
U2234, Roe Mill Road, Limavady, - Road Closure, U2234, Roe Mill Road, Limavady
Road closure required for Sewer and Water Connections (Road Crossing with deep Excavation).
Closure to operate: Continuous.  Diversion to operate, delays expected.
Alternative Route Via: U2515 RATHBRADY ROAD, B0068 IRISH GREEN STREET, A0371 IRISH GREEN STREET, A0371 CATHERINE STREET.
Closure to operate: Continuous.  Diversion to operate, delays expected.
Alternative Route Via: U2515 RATHBRADY ROAD, B0068 IRISH GREEN STREET, A0371 IRISH GREEN STREET, A0371 CATHERINE STREET.
15/07/2026 15:57:00 : ROADWORKS
C0647, Brantry Road, Dungannon, - Road Closure, C0647, Brantry Road, Dungannon
Road closure required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational daily (07:00-22:00) from Mon 20 Jul 2026 to: Fri 31 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0647 CARRYCASTLE ROAD, U0526 CREEVELOUGH ROAD
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational daily (07:00-22:00) from Mon 20 Jul 2026 to: Fri 31 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0647 CARRYCASTLE ROAD, U0526 CREEVELOUGH ROAD
The anticipated delay will be Less than 5 minutes
15/07/2026 15:55:00 : ROADWORKS
C0627, Ballynahaye Road, Dungannon, - Road Closure, C0627, Ballynahaye Road, Dungannon
Road closure required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational daily (07:00-22:00) from Mon 20 Jul 2026 to: Fri 31 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0633 WHITEBRIDGE ROAD, C0627 CLOGHFIN ROAD, U6517 CLOGHFIN ROAD, C0627 BALLYNAHAYE ROAD, U1038 WHITEBRIDGE ROAD, U0311 CAVEY ROAD, A0005 OMAGH ROAD, A0005 null, B0034 DUNGANNON ROAD, C0627 AGHNAGAR ROAD
Closure to operate: This will be operational daily (07:00-22:00) from Mon 20 Jul 2026 to: Fri 31 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0633 WHITEBRIDGE ROAD, C0627 CLOGHFIN ROAD, U6517 CLOGHFIN ROAD, C0627 BALLYNAHAYE ROAD, U1038 WHITEBRIDGE ROAD, U0311 CAVEY ROAD, A0005 OMAGH ROAD, A0005 null, B0034 DUNGANNON ROAD, C0627 AGHNAGAR ROAD
15/07/2026 15:52:00 : ROADWORKS
B43, Pomeroy Road, Dungannon, - Lane Closure, B43, Pomeroy Road, Dungannon
Lane Closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 15:50:00 : ROADWORKS
B0043, Pomeroy Road, Dungannon, - Lane Closure, B0043, Pomeroy Road, Dungannon
Lane Closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 13:24:00 : ROADWORKS
A5, Victoria Road, Strabane, - Lane Closure, A5, Victoria Road, Strabane
Lane Closure required to facilitate DfI for carriageway resurfacing.
Closure to operate: Monday 27 July 2026 until Friday 14 August 2026 between the hours of 08:00 to 18:00. Diversion to operate, delays expected.
Alternative Route Via:Â During the times of the lane closure a diversionary route will be signed as follows: B48 Duncastle Road, B49 Berryhill Road, B49 Woodend Road.
Closure to operate: Monday 27 July 2026 until Friday 14 August 2026 between the hours of 08:00 to 18:00. Diversion to operate, delays expected.
Alternative Route Via:Â During the times of the lane closure a diversionary route will be signed as follows: B48 Duncastle Road, B49 Berryhill Road, B49 Woodend Road.
15/07/2026 10:40:00 : ROADWORKS
C0633, Old Omagh Road, Dungannon, - Lane Closure, C0633, Old Omagh Road, Dungannon
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational Daily 09:00 to 17:00 from Mon 27 Jul 2026 to: Thu 30 Jul 2026. Traffic control to operate, delays expected.
Alternative Route Via:Â The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:00 to 17:00 from Mon 27 Jul 2026 to: Thu 30 Jul 2026. Traffic control to operate, delays expected.
Alternative Route Via:Â The anticipated delay will be Less than 5 minutes
15/07/2026 10:38:00 : ROADWORKS
U4153, Boyds Road, Dunloy, - Road Closure, U4153, Boyds Road, Dunloy
Road closure required to NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U4122 ANTICUR ROAD, B0016 BELLAGHY ROAD, B0093 KILLAGAN ROAD, U4153 BOYDS ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U4122 ANTICUR ROAD, B0016 BELLAGHY ROAD, B0093 KILLAGAN ROAD, U4153 BOYDS ROAD.
15/07/2026 10:37:00 : ROADWORKS BELFAST
M1 Craigavon Eastbound Road Closure Lurgan to Moira, M1, Craigavon
Road closure required to facilitate Principal Bridge Inspections
Closure to operate: overnight only Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Lough Road Eastbound off slip, Lough Road, Kiln Road, Silverwood Road, Francis Street, Millennium Way, Banbridge Road, Flush Place, Avenue Road, Belfast Road, Lurgan Road, Main Street Moira to M1 Eastbound
15/07/2026 10:33:00 : ROADWORKS
A0029, Drumcroon Road, Coleraine, - Lane Closure, A0029, Drumcroon Road, Coleraine
Lane Closure required For Full-Service Water Connection (13m Road Crossing).
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
15/07/2026 10:30:00 : ROADWORKS
A0044, Magheramore Road Maghermore - Lane Closure, A0044, Magheramore road Maghermore, Maghermore
Lane Closure required For Telecoms works - Maintenance to Phone mast TTM - 2-way Temporary traffic signals.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
15/07/2026 10:26:00 : ROADWORKS BELFAST
M1 Craigavon W'bound Road Closure Moira-Lurgan, M1, Craigavon
Road closure required to facilitate Principal Bridge Inspections
Closure to operate: overnight only Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Lisburn Road Moira, Main Street, Lurgan Road, Belfast Road, Avenue Road, Flush Place, Banbridge Road, Millennium Way, Edward Street, Francis Street, Silverwood Road, Kiln Road & Lough Road to M1 Westbound
15/07/2026 10:26:00 : ROADWORKS
A0042, Carnlough Road, Ballymena, - Lane Closure, A0042, Carnlough Road, Ballymena
Lane Closure required for NIE Overhead Line Work.
Closure to operate: Daily.Traffic control to operate, delays expected.
Closure to operate: Daily.Traffic control to operate, delays expected.
15/07/2026 10:23:00 : ROADWORKS
A0006, Glenshane Road, Magherafelt, - Lane Closure, A0006, Glenshane Road, Magherafelt
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Fri 21 Aug 2026. Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0557 HILLHEAD ROAD
The anticipated delay will be 5 - 15 minutes
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Fri 21 Aug 2026. Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0557 HILLHEAD ROAD
The anticipated delay will be 5 - 15 minutes
15/07/2026 10:19:00 : ROADWORKS
A0054, Ballymacombs Road, Ballymena, - Lane Closure, A0054, Ballymacombs Road, Ballymena
Delete bold as appropriate & fill in information in italics:
Road closure/Lane Closure required to facilitate work by DMCC GROUNDS WORKS LTD
Closure to operate: This will be operational Daily from Mon 27 Jul 2026 to: Fri 14 Aug 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Road closure/Lane Closure required to facilitate work by DMCC GROUNDS WORKS LTD
Closure to operate: This will be operational Daily from Mon 27 Jul 2026 to: Fri 14 Aug 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 10:16:00 : ROADWORKS
A29, Desertmartin Road, Magherafelt, - Lane Closure, A29, Desertmartin Road, Magherafelt
Lane Closure required to facilitate work by Greentown Co
Closure to operate: This will be operational Daily 09:30 to 16:30 from Fri 24 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Fri 24 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 10:13:00 : ROADWORKS
A1 Banbridge Road Closure N'bound Newry Rd-Rathfriland Rd, A1, Banbridge
Road closure required to facilitate Principle Bridge Inspections
Closure to operate: overnight only Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Newry Road Northbound off slip, Newry Road, Kenlis Street, Rathfriland Road to Rathfriland Road Northbound on slip
15/07/2026 10:13:00 : ROADWORKS
A29, Moneymore Road, Cookstown, - Lane Closure, A29, Moneymore Road, Cookstown
Lane Closure required to facilitate work by BT Openreach
Closure to operate:Â This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Mon 20 Jul 2026.
Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate:Â This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Mon 20 Jul 2026.
Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 10:10:00 : ROADWORKS
A0505, Drum Road, Cookstown, - 15 Minute Obstruction, A0505, Drum Road, Cookstown
15 Min Obstruction required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 09 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 09 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
15/07/2026 09:54:00 : ROADWORKS
A1 Dromore, Road Closure Northbound RTL @ Milebush Rd, A1, Dromore
Road closure/Lane Closure required to facilitate NIE works on Milebush Road
Closure to operate: 09.30 - 16.30 (1 day) Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â A1 Northbound to Hillsborough Road off slip, Hillsborough Road & Jubilee Road.
10/07/2026 16:34:00 : ROADWORKS
A0029, Desertmartin Road, Magherafelt, - Lane Closure, A0029, Desertmartin Road, Magherafelt
Lane Closure required to facilitate work by Fibrus
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
10/07/2026 16:30:00 : ROADWORKS
U1809, Cloughboy Road, Strabane, - Road Closure, U1809, Cloughboy Road, Strabane
Road closure required to facilitate work by David Smyth
Closure to operate: This will be operational Daily 09:00 to 17:00 from Mon 20 Jul 2026 to: Mon 27 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U1809 CLOGHBOY ROAD, A0005 VICTORIA ROAD, U1809 DUNNALONG ROAD, U1809 DUNNALONG MANOR
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:00 to 17:00 from Mon 20 Jul 2026 to: Mon 27 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U1809 CLOGHBOY ROAD, A0005 VICTORIA ROAD, U1809 DUNNALONG ROAD, U1809 DUNNALONG MANOR
The anticipated delay will be Less than 5 minutes
10/07/2026 16:26:00 : ROADWORKS
U1556, Bridge Street, Londonderry, - Road Closure, U1556, Bridge Street, Londonderry
Road closure/Lane Closure required to facilitate work by Kay Neeson
Closure to operate: This will be operational Continuous other from Sun 19 Jul 2026 to: Sun 19 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0578 CARLISLE ROAD, A1002 JOHN STREET, U1556 FOYLE STREET, B0528 FOYLE STREET, A1002 FOYLE EMBANKMENT
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Continuous other from Sun 19 Jul 2026 to: Sun 19 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0578 CARLISLE ROAD, A1002 JOHN STREET, U1556 FOYLE STREET, B0528 FOYLE STREET, A1002 FOYLE EMBANKMENT
The anticipated delay will be Less than 5 minutes
10/07/2026 16:23:00 : ROADWORKS
A32, Irvinestown Road, Enniskillen, - Road Closure, A32, Irvinestown Road, Enniskillen
Road closure required to replace a defective culvert and resurface the carriageway.
Closure to operate: From Monday 20th July at 05:00 until 18:00 Friday 24th July. Diversion to operate, delays expected.
Alternative Route Via:Â Diversionary Signage on each approach to the works.
Notes: Access for Emergency Vehicles to be provided. Access to the hospital will continue as normal for traffic approaching the works site on the A32 from Trory Roundabout (Irvinestown side).
Please allow adequate time for Hospital Appointments at South West Acute Hospital (SWAH).
10/07/2026 16:21:00 : ROADWORKS
C0604, Dunnyboe Road, Strabane, - Road Closure, C0604, Dunnyboe Road, Strabane
Road closure required to facilitate work by Mills Contracts LTD
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Thu 23 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U2011 MEENDAMPH ROAD, U1957 MEENDAMPH ROAD, U2013 CROCKROUR ROAD, U2012 CROCKROUR ROAD, U2014 AGHABRACK ROAD Diversion 2: C0604 DUNNYBOE ROAD, U1847 ROUSKEY ROAD, B0048 LISNARAGH ROAD, U2014 AGHABRACK ROAD
The anticipated delay will be 5 - 15 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Thu 23 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U2011 MEENDAMPH ROAD, U1957 MEENDAMPH ROAD, U2013 CROCKROUR ROAD, U2012 CROCKROUR ROAD, U2014 AGHABRACK ROAD Diversion 2: C0604 DUNNYBOE ROAD, U1847 ROUSKEY ROAD, B0048 LISNARAGH ROAD, U2014 AGHABRACK ROAD
The anticipated delay will be 5 - 15 minutes
10/07/2026 16:18:00 : ROADWORKS
U1828, Lowertown Road, Strabane, - Road Closure, U1828, Lowertown Road, Strabane
Road closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Sat 25 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U1828 LOWERTOWN ROAD, U1824 LECKPATRICK ROAD, C0602 BALLYHEATHER ROAD
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Sat 25 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U1828 LOWERTOWN ROAD, U1824 LECKPATRICK ROAD, C0602 BALLYHEATHER ROAD
The anticipated delay will be Less than 5 minutes
10/07/2026 16:15:00 : ROADWORKS
U1161, Killymallaght Road, Londonderry, - Road Closure, U1161, Killymallaght Road, Londonderry
Road closure required to facilitate work by NIE - NIE Networks
Closure to operate: This will be operational Daily 09:00 to 17:00 from Tue 21 Jul 2026 to: Tue 21 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0516 TRENCH ROAD, B0048 DUNCASTLE ROAD, U1843 KILLYMALLAGHT ROAD
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:00 to 17:00 from Tue 21 Jul 2026 to: Tue 21 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0516 TRENCH ROAD, B0048 DUNCASTLE ROAD, U1843 KILLYMALLAGHT ROAD
The anticipated delay will be Less than 5 minutes
10/07/2026 16:11:00 : ROADWORKS
U5079, School Lane, Magherafelt, - One Way Closure, U5079, School Lane, Magherafelt
One Way Closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 08:00 to 18:00 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U5079 SCHOOL LANE
Access for residents to be maintained due to no suitable diversion.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 08:00 to 18:00 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U5079 SCHOOL LANE
Access for residents to be maintained due to no suitable diversion.
The anticipated delay will be Less than 5 minutes
10/07/2026 16:08:00 : ROADWORKS
C0550, Culnady Road, Maghera, - Road Closure, C0550, Culnady Road, Maghera
Road closure required to facilitate work by NIE - NIE Networks
Closure to operate: This will be operational Daily 09:00 to 17:00 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0550 CULNADY ROAD, U5062 DRUMMUCK ROAD, U5061 DRUMMUCK ROAD, C0549 CREW ROAD, U5030 CREW ROAD, C0549 BALLYMACILCURR ROAD
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:00 to 17:00 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0550 CULNADY ROAD, U5062 DRUMMUCK ROAD, U5061 DRUMMUCK ROAD, C0549 CREW ROAD, U5030 CREW ROAD, C0549 BALLYMACILCURR ROAD
The anticipated delay will be Less than 5 minutes
10/07/2026 16:02:00 : ROADWORKS
C0567, Ballybriest Road, Cookstown, - Road Closure, C0567, Ballybriest Road, Cookstown
Road closure required to facilitate work by NI Water Capital
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Fri 14 Aug 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0567 BALLYBRIEST ROAD, U2214 MOBUY ROAD, U5200 CULLION ROAD, C0567 CLAGGAN ROAD
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Fri 14 Aug 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0567 BALLYBRIEST ROAD, U2214 MOBUY ROAD, U5200 CULLION ROAD, C0567 CLAGGAN ROAD
10/07/2026 16:00:00 : ROADWORKS
C0551, Slaghtneill Road, Maghera, - Road Closure, C0551, Slaghtneill Road, Maghera
Road closure required to  facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0551 CORLACKY ROAD, U5039 HALFGAYNE ROAD, C0551 TIRKANE ROAD
The anticipated delay will be 5 - 15 minutes
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0551 CORLACKY ROAD, U5039 HALFGAYNE ROAD, C0551 TIRKANE ROAD
The anticipated delay will be 5 - 15 minutes
10/07/2026 15:57:00 : ROADWORKS
B0040, High Street, Magherafelt, - Road Closure, B0040, High Street, Magherafelt
Road closure required to facilitate work by NI Water Operations
Closure to operate: This will be operational Continuous other from Wed 15 Jul 2026 to: Fri 24 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U5269 THE SQUARE, B0041 TOBERMORE ROAD
Works planned to start 8am Wednesday 15th July and completed by 4pm Friday 24th July. Deep Excavation with Road Crossing.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Continuous other from Wed 15 Jul 2026 to: Fri 24 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U5269 THE SQUARE, B0041 TOBERMORE ROAD
Works planned to start 8am Wednesday 15th July and completed by 4pm Friday 24th July. Deep Excavation with Road Crossing.
The anticipated delay will be Less than 5 minutes
10/07/2026 14:37:00 : ROADWORKS
C0546, Boveedy Road, Garvagh, - Road Closure, C0546, Boveedy Road, Garvagh
Road closure required for NI Water rehab works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U3378 DULLAGHY ROAD, C0546 BLACKROCK ROAD, U3376 DRUMSARAGH ROAD, U3376 HILL HEAD ROAD, C0546 BOVEEDY ROAD. Diversion 2: U3378 DULLAGHY ROAD, U3379 BARNSIDE ROAD, U3379 SPRINGFIELD ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U3378 DULLAGHY ROAD, C0546 BLACKROCK ROAD, U3376 DRUMSARAGH ROAD, U3376 HILL HEAD ROAD, C0546 BOVEEDY ROAD. Diversion 2: U3378 DULLAGHY ROAD, U3379 BARNSIDE ROAD, U3379 SPRINGFIELD ROAD.
10/07/2026 13:39:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Saintfield Road, Belfast
Lane Closure required for NIW meter works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
10/07/2026 13:35:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Saintfield Road, Belfast
Lane Closure required for NIW meter works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
10/07/2026 13:30:00 : ROADWORKS BELFAST
LANE CLOSURE, B178, Hillsborough Road, Belfast
Lane Closure required for BT poling and cabling works.
Closure to operate:Â from 8am to 6pm.
Traffic control to operate, delays expected.
Closure to operate:Â from 8am to 6pm.
Traffic control to operate, delays expected.
10/07/2026 13:27:00 : ROADWORKS
LANE CLOSURE, B6, Saintfield Road, Lisburn
Lane Closure required for poling works.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
10/07/2026 12:48:00 : ROADWORKS
A0514, Crescent Link, Londonderry, - One Way Closure, A0514, Crescent Link, Londonderry
One Way Closure required to facilitate work by BSG Civil Engineering
This will be operational Overnight other (20:00-06:00) from Tue 28 Jul 2026 to: Tue 28 Jul 2026
Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CLOONEY ROAD, A1002 LIMAVADY ROAD, A0006 GLENDERMOTT ROAD, A0006 DUNGIVEN ROAD, A0514 CRESCENT LINK
The anticipated delay will be Less than 5 minutes
This will be operational Overnight other (20:00-06:00) from Tue 28 Jul 2026 to: Tue 28 Jul 2026
Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CLOONEY ROAD, A1002 LIMAVADY ROAD, A0006 GLENDERMOTT ROAD, A0006 DUNGIVEN ROAD, A0514 CRESCENT LINK
The anticipated delay will be Less than 5 minutes
10/07/2026 12:36:00 : ROADWORKS
U4060, Newlands Road, Larne, - Road Closure, U4060, Newlands Road, Larne
Road closure required for BT Poling and Cabling Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U4059 BALLYHONE ROAD, U4060 CRAIGANEE ROAD, U4960 CRAIGANEE ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U4059 BALLYHONE ROAD, U4060 CRAIGANEE ROAD, U4960 CRAIGANEE ROAD.
10/07/2026 12:32:00 : ROADWORKS
U5035, Moycraig Road, Bushmills, - Road Closure, U5035, Moycraig Road, Bushmills
Road closure required for BT Cabling Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U5035 MOYCRAIG ROAD, C0100 MOYCRAIG ROAD, B0017 STRAID ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U5035 MOYCRAIG ROAD, C0100 MOYCRAIG ROAD, B0017 STRAID ROAD.
10/07/2026 12:28:00 : ROADWORKS
U4123, Bravallen Road, Dunloy, - Road Closure, U4123, Bravallen Road, Dunloy
Road closure required for Overhead Powerline Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0089 TULLAGHANS ROAD, U4125 MULLAN ROAD, B0062 FINVOY ROAD, C0090 BURNQUARTER ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â C0089 TULLAGHANS ROAD, U4125 MULLAN ROAD, B0062 FINVOY ROAD, C0090 BURNQUARTER ROAD.
10/07/2026 12:23:00 : ROADWORKS
U3302, Roselick Road, Portstewart, - Road Closure, U3302, Roselick Road, Portstewart
Road closure required for Essential maintenance works to level crossing.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â B0185 STATION ROAD, U3302 ROSELICK ROAD, U3302 BELLEMONT ROAD, B0185 CROMORE ROAD, U3300 ISLANDTASSERTY ROAD.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â B0185 STATION ROAD, U3302 ROSELICK ROAD, U3302 BELLEMONT ROAD, B0185 CROMORE ROAD, U3300 ISLANDTASSERTY ROAD.
10/07/2026 12:18:00 : ROADWORKS
A0037, Dunhill Road, Coleraine, - Lane Closure, A0037, Dunhill Road, Coleraine
Lane Closure required for DFI Road maintenance scheme, Gully cleaning, verge clearance, road sweeping etc.
Closure to operate:Â Daily.
 Traffic control to operate, delays expected.
Closure to operate:Â Daily.
 Traffic control to operate, delays expected.
10/07/2026 11:52:00 : ROADWORKS
LANE CLOSURE, A1, Hillsborough Road, Lisburn
Lane Closure required for NIE works.
Closure to operate: Continuously. Traffic control to operate, delays expected.
Closure to operate: Continuously. Traffic control to operate, delays expected.
10/07/2026 11:27:00 : ROADWORKS
U5033, Isle Road, Bushmills, - Road Closure, U5033, Isle Road, Bushmills
Road closure required for NIE Overhead Lines Works.
Closure to operate:Â Daily.
Diversion to operate, delays expected.
Alternative Route Via:Â U5033 ISLE ROAD, U5036 ISLANDRANNY ROAD, C0100 MOYCRAIG ROAD, B0017 STRAID ROAD.
Closure to operate:Â Daily.
Diversion to operate, delays expected.
Alternative Route Via:Â U5033 ISLE ROAD, U5036 ISLANDRANNY ROAD, C0100 MOYCRAIG ROAD, B0017 STRAID ROAD.
10/07/2026 11:23:00 : ROADWORKS
U2253, Curragh Road, Bellarena, - Road Closure, U2253, Curragh Road, Bellarena
Road closure required for NI railway level crossing maintenance.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â U2284 LIMESTONE ROAD, A2002 SEACOAST ROAD.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â U2284 LIMESTONE ROAD, A2002 SEACOAST ROAD.
10/07/2026 11:17:00 : ROADWORKS
U3302, Roselick Road, Portstewart, - Road Closure, U3302, Roselick Road, Portstewart
Road closure required for Fibre install to customers house.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U3302 ROSELICK ROAD, U3303 LOGUESTOWN ROAD, U3300 ISLANDTASSERTY ROAD, B0185 CROMORE ROAD, B0185 STATION ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U3302 ROSELICK ROAD, U3303 LOGUESTOWN ROAD, U3300 ISLANDTASSERTY ROAD, B0185 CROMORE ROAD, B0185 STATION ROAD.
10/07/2026 11:13:00 : ROADWORKS
U3337, Shinny Road, Macosquin, - Road Closure, U3337, Shinny Road, Macosquin
Road closure required for BT Poling Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0186 CASHEL ROAD, C0540 LETTERLOAN ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0186 CASHEL ROAD, C0540 LETTERLOAN ROAD.
10/07/2026 11:09:00 : ROADWORKS
U2220, Vale Road, Greysteel, - Road Closure, U2220, Vale Road, Greysteel
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2220 VALE ROAD, U2219 SHESKIN ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2220 VALE ROAD, U2219 SHESKIN ROAD.
10/07/2026 11:05:00 : ROADWORKS
U2143, Dungullion Road, Greysteel, - Road Closure, U2143, Dungullion Road, Greysteel
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Â U2132 KILLYLANE ROAD, A2002 CLOONEY ROAD, U2219 SHESKIN ROAD, U2143 UPPER LANE ROAD, U2143 DUNGULLION ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Â U2132 KILLYLANE ROAD, A2002 CLOONEY ROAD, U2219 SHESKIN ROAD, U2143 UPPER LANE ROAD, U2143 DUNGULLION ROAD.
10/07/2026 11:04:00 : ROADWORKS
A34, Moorlough Road, Enniskillen, - Lane Closure, A34, Moorlough Road, Enniskillen
Lane Closure required to facilitate work by BT Openreach
This will be operational Daily 08:00 to 18:00 from Fri 24 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
This will be operational Daily 08:00 to 18:00 from Fri 24 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
10/07/2026 11:00:00 : ROADWORKS
C0446, Glennasheevar Road, Enniskillen, - Lane Closure, C0446, Glennasheevar Road, Enniskillen
Lane Closure required to facilitate work by Mills Contracts LTD
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 23 Jul 2026 to: Fri 31 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 23 Jul 2026 to: Fri 31 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
10/07/2026 10:56:00 : ROADWORKS
A0032, Brownhill Link, Enniskillen, - Lane Closure, A0032, Brownhill Link, Enniskillen
Lane Closure required to facilitate work by Mills Contracts LTD
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Thu 23 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Thu 23 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
10/07/2026 10:52:00 : ROADWORKS
C0411, Ardlougher Road, Enniskillen, - Road Closure, C0411, Ardlougher Road, Enniskillen
Road closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Mon 27 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0411 ARDLOUGHER ROAD, B0534 LISNARICK ROAD, B0534 DRUMADRAVY ROAD, B0082 KILLADEAS ROAD
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Mon 27 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0411 ARDLOUGHER ROAD, B0534 LISNARICK ROAD, B0534 DRUMADRAVY ROAD, B0082 KILLADEAS ROAD
The anticipated delay will be Less than 5 minutes
10/07/2026 10:45:00 : ROADWORKS
A32, Cornagrade Road, Enniskillen, - Lane Closure, A32, Cornagrade Road, Enniskillen
Lane Closure required to facilitate work by GRAHAM
Closure to operate: This will be operational Continuous other from Mon 03 Aug 2026 to: Tue 25 Aug 2026. Traffic control to operate, delays expected.
No Sunday work permitted.
The anticipated delay will be 5 - 15 minutes
Closure to operate: This will be operational Continuous other from Mon 03 Aug 2026 to: Tue 25 Aug 2026. Traffic control to operate, delays expected.
No Sunday work permitted.
The anticipated delay will be 5 - 15 minutes
10/07/2026 10:15:00 : ROADWORKS
C0351, Ballygowan Road, Banbridge, - Lane Closure, C0351, Ballygowan Road, Banbridge
Lane Closure required to facilitate DFI Southern with works.
Closure to operate: From 09:00 on Monday 20 July 2026 to 17:00 on Friday 14 August 2026. Traffic control to operate, delays expected.
Closure to operate: From 09:00 on Monday 20 July 2026 to 17:00 on Friday 14 August 2026. Traffic control to operate, delays expected.
10/07/2026 10:12:00 : ROADWORKS
B0073, Drumconvis Road, Cookstown, - Lane Closure, B0073, Drumconvis Road, Cookstown
Lane Closure required to facilitate work by BT Openreach.
Closure to operate: This will be operational Daily 08:00 to 18:00 from Wed 22 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be less than 5 minutes.
Closure to operate: This will be operational Daily 08:00 to 18:00 from Wed 22 Jul 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be less than 5 minutes.
10/07/2026 10:09:00 : ROADWORKS
C0351, Ballygowan Road, Banbridge, - Road Closure, C0351, Ballygowan Road, Banbridge
Road closure required to facilitate DFI Southern with works.
Closure to operate: From 09:00 on Monday 17 August 2026 to 17:00 on Friday 11 September 2026. Diversion in place, delays expected.
Alternative Route Via:U4469 EDENDERRY ROAD, B0010 SCARVA ROAD, C0350 LISNAGADE ROAD, C0351 BALLYGOWAN ROAD
Closure to operate: From 09:00 on Monday 17 August 2026 to 17:00 on Friday 11 September 2026. Diversion in place, delays expected.
Alternative Route Via:U4469 EDENDERRY ROAD, B0010 SCARVA ROAD, C0350 LISNAGADE ROAD, C0351 BALLYGOWAN ROAD
10/07/2026 10:09:00 : ROADWORKS
B0048, Derry Road, Omagh, - Lane Closure, B0048, Derry Road, Omagh
Lane Closure required to facilitate work by NI Water Operations
This will be operational Continuous other from Mon 10 Aug 2026 to: Fri 21 Aug 2026. Traffic control to operate, delays expected.
Distance between lights kept to a minimum - works to take place during school holidays.
The anticipated delay will be Less than 5 minutes
This will be operational Continuous other from Mon 10 Aug 2026 to: Fri 21 Aug 2026. Traffic control to operate, delays expected.
Distance between lights kept to a minimum - works to take place during school holidays.
The anticipated delay will be Less than 5 minutes
09/07/2026 17:18:00 : ROADWORKS
U3365, Clagan Park, Three Oaks, - Road Closure, U3365, Clagan Park, Three Oaks
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â A0054 AGIVEY ROAD, B0188 MULLAGHINCH ROAD, U3365 CLAGAN PARK.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â A0054 AGIVEY ROAD, B0188 MULLAGHINCH ROAD, U3365 CLAGAN PARK.
09/07/2026 17:13:00 : ROADWORKS
U3032, Craigaboney Road, Bushmills, - Road Closure, U3032, Craigaboney Road, Bushmills
Road closure required for Fibre install to customers house, N0.31 Craigaboney Road.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via: B0017 PRIESTLAND ROAD, U3033 BALLYCLOGH ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via: B0017 PRIESTLAND ROAD, U3033 BALLYCLOGH ROAD.
09/07/2026 17:05:00 : ROADWORKS
A21, Newtownards Road, Bangor, - Lane Closure, A21, Newtownards Road, Bangor
Lane Closure required to Replace Manhole Cover and Frame.
Closure to operate: 07:00am to 12:00pm on Sun 19 Jul Traffic control to operate, delays expected.
Closure to operate: 07:00am to 12:00pm on Sun 19 Jul Traffic control to operate, delays expected.
09/07/2026 16:50:00 : ROADWORKS
A5002, Whitepark Road, Bushmills, - Lane Closure, A5002, Whitepark Road, Bushmills
Lane Closure required for BT Poling Works.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 16:46:00 : ROADWORKS
A0044, Drones Road, Ballymoney, - Lane Closure, A0044, Drones Road, Ballymoney
Lane Closure required for NIE Overhead Line Work.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 16:34:00 : ROADWORKS
A0044, Drones Road, Ballymoney, - Lane Closure, A0044, Drones Road, Ballymoney
Lane Closure required to facilitate fibre blowing and splicing for Openreach.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 16:32:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Saintfield Road, Belfast
Lane Closure required for NIW works - Replacement mag meter.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
09/07/2026 16:31:00 : ROADWORKS
U2248, Gortnahey Road, Dungiven, - Road Closure, U2248, Gortnahey Road, Dungiven
Road closure required for Testing Rod and Roping with Civils to clear blockages on the Fibrus Network.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2416 KILLYBLIGHT ROAD, U2246 BOVEVAGH ROAD, B0192 DRUMRANE ROAD, U2248 GORTNAHEY ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2416 KILLYBLIGHT ROAD, U2246 BOVEVAGH ROAD, B0192 DRUMRANE ROAD, U2248 GORTNAHEY ROAD.
09/07/2026 16:29:00 : ROADWORKS
LANE CLOSURE, Pond Park Road, Lisburn
Lane Closure required for a new sewer connection.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
09/07/2026 16:26:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Saintfield Road at Manse Road, Belfast
Lane Closure required for a new gas connection.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
09/07/2026 16:23:00 : ROADWORKS
LANE CLOSURE, Sloan Street, Lisburn
Lane Closure required for repair of defective apparatus.
Closure to operate: Off-peak - weekend.  Traffic control to operate, delays expected.
Closure to operate: Off-peak - weekend.  Traffic control to operate, delays expected.
09/07/2026 16:17:00 : ROADWORKS BELFAST
ROAD CLOSURE - DIVERSION IN PLACE, North Road, Belfast
Road closure required for NIW - Water connection.
Closure to operate: Off-peak - weekend.  Diversion to operate, delays expected.
Alternative Route Via:Â A20 UPPER NEWTOWNARDS ROAD, GRAMPIAN AVENUE, B505 HOLYWOOD ROAD, DUNDELA AVENUE, NORTH ROAD.
Closure to operate: Off-peak - weekend.  Diversion to operate, delays expected.
Alternative Route Via:Â A20 UPPER NEWTOWNARDS ROAD, GRAMPIAN AVENUE, B505 HOLYWOOD ROAD, DUNDELA AVENUE, NORTH ROAD.
09/07/2026 16:14:00 : ROADWORKS
ONE-WAY ROAD CLOSURE - DIVERSION IN PLACE, Ravernet Road, Lisburn
Road closure required for repair of defective apparatus.
Closure to operate: Off-peak - weekend. Diversion to operate, delays expected.
Alternative Route Via:Â A1 HILLSBOROUGH ROAD, A1 LAGANBANK ROAD, A1 QUEENS ROAD,A49 SLOAN STREET, C297 YOUNG STREET, C305 HILLSBOROUGH OLD ROAD.
Closure to operate: Off-peak - weekend. Diversion to operate, delays expected.
Alternative Route Via:Â A1 HILLSBOROUGH ROAD, A1 LAGANBANK ROAD, A1 QUEENS ROAD,A49 SLOAN STREET, C297 YOUNG STREET, C305 HILLSBOROUGH OLD ROAD.
09/07/2026 16:10:00 : ROADWORKS
LANE CLOSURE, A1, Hillsborough Road, Lisburn
Lane Closure required to repair defective apparatus.
Closure to operate: Off-peak - weekend.  Traffic control to operate, delays expected.
Closure to operate: Off-peak - weekend.  Traffic control to operate, delays expected.
09/07/2026 15:56:00 : ROADWORKS
B0080, TATTYMOYLE ROAD, FINTONA, Omagh, - Road Closure, B0080, TATTYMOYLE ROAD, FINTONA, Omagh
Road closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: DFI Resurfacing works
Closure to operate: Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Sat 01 Aug 2026 Diversion to operate, delays expected.The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: B0107 CLABBY ROAD, A0004 EDFIELD WAY, U7001 EDFIELD WAY, B0122 MURLEY ROAD, B0122 ECCLESVILLE ROAD, B0122 KILN STREET, B0080 TATTYMOYLE ROAD
09/07/2026 15:47:00 : ROADWORKS
B0004, DRUMNAKILLY ROAD, OMAGH, Omagh, - Lane Closure, B0004, DRUMNAKILLY ROAD, OMAGH, Omagh
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: Civil Engineering
Closure to operate:Â Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Sat 08 Aug 2026
Traffic control to operate, delays expected.
09/07/2026 15:43:00 : ROADWORKS
B0073, MOLESWORTH STREET, COOKSTOWN, - Lane Closure, B0073, MOLESWORTH STREET, COOKSTOWN, Cookstown
Lane Closure required to facilitate work by AG Wilson Civil EngineeringReason for closure: NI Water sewer extension
Closure to operate: Mon 27 Jul 2026 to: Tue 04 Aug 2026 Traffic control to operate, delays expected.
09/07/2026 15:34:00 : ROADWORKS
U1742, FARMHILL ROAD, OMAGH, Omagh, - Road Closure, U1742, FARMHILL ROAD, OMAGH, Omagh
Road closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: Civil Engineering works
Closure to operate:Â Daily 08:00 to 18:00 from Mon 20 Jul 2026 to: Fri 07 Aug 2026
Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0004 DRUMNAKILLY ROAD, B0004 DONAGHANIE ROAD, B0004 HOSPITAL ROAD, A0505 KILLYCLOGHER ROAD
09/07/2026 15:25:00 : ROADWORKS
A505, BARONY ROAD, CREGGAN, Omagh, - Road Closure, A505, BARONY ROAD, CREGGAN, Omagh
Road closure required to facilitate work by NIE - NIE NetworksReason for closure: NIE Overhead Line Works
Closure to operate:Â Daily 09:30 to 16:30 from Sun 26 Jul 2026 to: Sun 26 Jul 2026Â Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: A0505 BARONY ROAD, A0505 DRUM ROAD, A0505 Drum Road, B0004 POMEROYROAD, B0162 POMEROY ROAD, B0004 TULLYREAVY ROAD, B0004 EDENDOIT ROAD, B0004MAIN STREET, B0004 CAVANAKEERAN ROAD, B0004 TERMON ROAD, B0004 DRUMNAKILLYROAD, B0004 null, C0627 null, B0158 null, B0004 DONAGHANIE ROAD, B0004 HOSPITAL ROAD,A0505 KILLYCLOGHER ROAD
09/07/2026 13:04:00 : ROADWORKS
A0006, Antrim Road, Newtownabbey, - Lane Closure, A0006, Antrim Road, Newtownabbey
Lane Closure required for NI Water- to replace manhole cover and frame.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 13:03:00 : ROADWORKS
A0002, Shore Road, Newtownabbey , - Lane Closure/Diversion , A0002, Shore Road, Newtownabbey
Lane Closure With Diversion required for NIW works - Replace manhole cover and frame.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â A0002 SHORE ROAD, C0032 LONGWOOD ROAD, C0032 CHURCH ROAD, U0407 CHURCH ROAD, U0407 LONGLANDS ROAD, U0407 MILL ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â A0002 SHORE ROAD, C0032 LONGWOOD ROAD, C0032 CHURCH ROAD, U0407 CHURCH ROAD, U0407 LONGLANDS ROAD, U0407 MILL ROAD.
09/07/2026 13:03:00 : ROADWORKS
A0042, Carnlough Road, Ballymena, - Lane Closure, A0042, Carnlough Road, Ballymena
Lane Closure required to renew frame and cover.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
09/07/2026 13:01:00 : ROADWORKS BELFAST
A0002, Belfast Road, Carrickfergus, - Lane Closure, A0002, Belfast Road, Whitehead
Lane Closure required for Fibre install to customers house, No.111 Belfast Road.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 12:59:00 : ROADWORKS
A0026, Lodge Road, Coleraine, - Lane Closure, A0026, Lodge Road, Coleraine
Lane Closure required for BT Poling Works.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
09/07/2026 12:56:00 : ROADWORKS
A0523, Waveney Road, Ballymena, - Lane Closure/Diversion , A0523, Waveney Road, Ballymena
Lane Closure with Diversion required for ducting road crossing at Galgorm Road drainage road crossing at Galgorm Road, Ducting road crossing at Waveney Road, Drainage road crossing at Waveney.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â A0026 NORTH ROAD, A0042 GALGORM ROAD.Â
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â A0026 NORTH ROAD, A0042 GALGORM ROAD.Â
09/07/2026 12:31:00 : ROADWORKS
B50, Omagh Road, Omagh, - Lane Closure, B50, Omagh Road, Omagh
Lane Closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 09:30 to 16:30 from Fri 31 Jul 2026 to: Fri 31 Jul 2026. Traffic control to operate, delays expected.
Alternative Route Via:Â The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Fri 31 Jul 2026 to: Fri 31 Jul 2026. Traffic control to operate, delays expected.
Alternative Route Via:Â The anticipated delay will be Less than 5 minutes
09/07/2026 12:29:00 : ROADWORKS
B0122, Tattyreagh Road, Omagh, - Lane Closure, B0122, Tattyreagh Road, Omagh
Lane Closure required to to facilitate work by Fibrus
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 30 Jul 2026 to: Thu 30 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Thu 30 Jul 2026 to: Thu 30 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
09/07/2026 12:26:00 : ROADWORKS
B46, Crockanboy Road, Omagh, - Lane Closure, B46, Crockanboy Road, Omagh
Lane Closure required to facilitate work by NIE - NIE Networks
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
09/07/2026 12:23:00 : ROADWORKS
C0671, Castletown Road, Omagh, - Road Closure, C0671, Castletown Road, Omagh
Road closure required to facilitate work by BT Openreach
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0671 CASTLETOWN ROAD, U1516 MOUNTJOY AVENUE, A0005 BELTANY ROAD, U1524 KILLYNURE ROAD Diversion 2: U1516 CASHTY ROAD, U1516 null, U1516 DUNTEIGE ROAD
Closure to operate: This will be operational Daily 09:30 to 16:30 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0671 CASTLETOWN ROAD, U1516 MOUNTJOY AVENUE, A0005 BELTANY ROAD, U1524 KILLYNURE ROAD Diversion 2: U1516 CASHTY ROAD, U1516 null, U1516 DUNTEIGE ROAD
09/07/2026 11:20:00 : ROADWORKS
U2074, Tamlough Road, Randalstown, - Road Closure, U2074, Tamlough Road, Randalstown
Road closure required for NIE Overhead Line Works.Â
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2074 TAMLOUGH ROAD, B0018 WHITESIDES ROAD, C0050 CADDY ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2074 TAMLOUGH ROAD, B0018 WHITESIDES ROAD, C0050 CADDY ROAD.
09/07/2026 11:14:00 : ROADWORKS
U2028, Old Cullybackey Road, Ballymena, - Road Closure, U2028, Old Cullybackey Road, Ballymena
Road closure required for Carriageway Resurfacing.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0062 CULLYBACKEY ROAD, U2029 WOODTOWN ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0062 CULLYBACKEY ROAD, U2029 WOODTOWN ROAD.
08/07/2026 16:28:00 : ROADWORKS
LANE CLOSURE, A49, Old Ballynahinch Road, Lisburn
Lane Closure required for BT poling works.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
08/07/2026 15:45:00 : ROADWORKS
LANE CLOSURE, B177, Ballynahinch Road, Hillsborough
Lane Closure required for meter works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
08/07/2026 15:40:00 : ROADWORKS
LANE CLOSURE, A49, Old Ballynahinch Road, Lisburn
Lane Closure required for NIW - meter works.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
Closure to operate: from 8am to 6pm. Traffic control to operate, delays expected.
08/07/2026 15:37:00 : ROADWORKS
B178, Hillsborough Road, Carryduff, - Lane Closure, B178, Hillsborough Road, Carryduff
Lane Closure required to replace or relevel (SV AV FH) boxes.
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
08/07/2026 15:28:00 : ROADWORKS BELFAST
ROAD CLOSED - DIVERSION IN PLACE, Newforge Lane, Belfast
Road closure required for BT poling works.
Closure to operate: from 8am to 6pm. Diversion to operate, delays expected.
Alternative Route Via:Â Malone Road.
Closure to operate: from 8am to 6pm. Diversion to operate, delays expected.
Alternative Route Via:Â Malone Road.
08/07/2026 15:02:00 : ROADWORKS
LANE CLOSURE, A26, Moira Road at Crewe Park Road, Crumlin
Lane Closure required for NIE overhead line works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
08/07/2026 14:59:00 : ROADWORKS
LANE CLOSURE, A3, Moira Road, Lisburn
Lane Closure required for NIE overhead line works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
08/07/2026 14:38:00 : ROADWORKS BELFAST
ROAD CLOSED - DIVERSION IN PLACE, Manse Road AT CADGER ROAD, Belfast
Road closure required for installation of new NIW watermain.
Closure to operate: Continuously.  Diversion to operate, delays expected.
Alternative Route Via: Cadger Road – B178 Comber Road – A7 Saintfield Road – A24 Saintfield Road – Manse Road.Â
Closure to operate: Continuously.  Diversion to operate, delays expected.
Alternative Route Via: Cadger Road – B178 Comber Road – A7 Saintfield Road – A24 Saintfield Road – Manse Road.Â
08/07/2026 14:34:00 : ROADWORKS
ROAD CLOSED - DIVERSION IN PLACE, Halfpenny Gate Road, Craigavon
Road closure required for carriageway resurfacing.
Closure to operate:Â Daily from 08:00hrs to 18:00hrs. Â
Diversion to operate, delays expected.
Alternative Route Via:Lurganure Road – Church Lane – A3 Moira Road – Lisburn Road – Damhead Road.
Closure to operate:Â Daily from 08:00hrs to 18:00hrs. Â
Diversion to operate, delays expected.
Alternative Route Via:Lurganure Road – Church Lane – A3 Moira Road – Lisburn Road – Damhead Road.
08/07/2026 11:28:00 : ROADWORKS
A0036, Moorfields Road, Ballymena, - Lane Closure, A0036, Moorfields Road, Ballymena
Lane Closure required for BT Openreach.
Closure to operate:Â Daily.
 raffic control to operate, delays expected.
Closure to operate:Â Daily.
 raffic control to operate, delays expected.
08/07/2026 11:25:00 : ROADWORKS
A0026, North Road, Ballymena, - Lane Closure, A0026, North Road, Ballymena
Lane Closure required for DFI Drainage proofing.
Closure to operate: Overnight. Traffic control to operate, delays expected.
Closure to operate: Overnight. Traffic control to operate, delays expected.
08/07/2026 11:21:00 : ROADWORKS
U3036, Ballymacrea Road, Portrush, - Lane Closure, U3036, Ballymacrea Road, Portrush
Lane Closure required to assist with the installation of new NIE underground mains cables.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
08/07/2026 11:16:00 : ROADWORKS
B0062, Finvoy Road, Ballymoney, - Road Closure, B0062, Finvoy Road, Ballymoney
Road closure required for NIE Cable Laying.
Closure to operate:Â Continuous. Â Diversion to operate, delays expected.
Alternative Route Via:Â B0062 FINVOY ROAD, B0062 MAIN STREET, B0062 CHURCH ROAD, B0062 BANN ROAD, B0064 BANN ROAD, B0070 BALLYMACONNELLY ROAD.
Closure to operate:Â Continuous. Â Diversion to operate, delays expected.
Alternative Route Via:Â B0062 FINVOY ROAD, B0062 MAIN STREET, B0062 CHURCH ROAD, B0062 BANN ROAD, B0064 BANN ROAD, B0070 BALLYMACONNELLY ROAD.
08/07/2026 11:11:00 : ROADWORKS
U3141, Donegall Crescent, Whitehead, - Road Closure, U3141, Donegall Crescent, Whitehead
Road closure required for NI Water - Repair Gravity Sewer.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U3141 DONEGALL CRESCENT, U3141 DONEGALL RISE, U3141 DONEGALL AVENUE.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U3141 DONEGALL CRESCENT, U3141 DONEGALL RISE, U3141 DONEGALL AVENUE.
08/07/2026 11:10:00 : ROADWORKS
C0635, Reclain Road, Dungannon, - Road Closure, C0635, Reclain Road, Dungannon
Road closure required to to facilitate work by BT Openreach. Fibre install to customers house, 54 Reclain Road
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U0914 DERNANAUGHT ROAD, U0906 CAPPAGH ROAD, U0906 SESSIADONAGHY ROAD, C0635 SESSIADONAGHY ROAD, C0635 RECLAIN ROAD
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U0914 DERNANAUGHT ROAD, U0906 CAPPAGH ROAD, U0906 SESSIADONAGHY ROAD, C0635 SESSIADONAGHY ROAD, C0635 RECLAIN ROAD
08/07/2026 11:03:00 : ROADWORKS
A29, Carland Road, Dungannon, - Lane Closure, A29, Carland Road, Dungannon
Lane Closure required to facilitate work by Evolve for new installation of gas service to 35 carland road with traffic lights as per chapter 8.
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
08/07/2026 10:21:00 : ROADWORKS
A0005, Victoria Road, Strabane, - Lane Closure, A0005, Victoria Road, Strabane
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Fri 14 Aug 2026 Diversion to operate, delays expected.
An alternative route will be signed with traffic being diverted via: Diversion 1: A0005 VICTORIA ROAD, B0048 DUNCASTLE ROAD, B0049 BERRYHILL ROAD, B0049 WOODEND ROAD
Closure to operate: This will be operational Daily 08:00 to 18:00 from Mon 27 Jul 2026 to: Fri 14 Aug 2026 Diversion to operate, delays expected.
An alternative route will be signed with traffic being diverted via: Diversion 1: A0005 VICTORIA ROAD, B0048 DUNCASTLE ROAD, B0049 BERRYHILL ROAD, B0049 WOODEND ROAD
07/07/2026 17:57:00 : ROADWORKS
B0050, GILLYGOOLEY ROAD, Omagh, - Lane Closure, B0050, GILLYGOOLEY ROAD, Omagh
Lane Closure required to facilitate work by Greentown Co for tree cutting works for fibre installation.
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
07/07/2026 17:52:00 : ROADWORKS
B0084, DOOISH ROAD, Omagh, - Lane Closure, B0084, DOOISH ROAD, Omagh
Lane Closure required to facilitate work by Greentown Co. Tree cutting work for new fibre connection.
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
Closure to operate: This will be operational Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
07/07/2026 17:06:00 : ROADWORKS
A0026, Railway Road, Coleraine, - Lane Closure, A0026, Railway Road, Coleraine
Lane Closure required for NIE Cable Laying.
Closure to operate: Overnight.  Traffic control to operate, delays expected.
Closure to operate: Overnight.  Traffic control to operate, delays expected.
07/07/2026 17:00:00 : ROADWORKS
A0026, Union Street, Coleraine, - Lane Closure - Diversion , A0026, Union Street, Coleraine
Lane Closure with diversion required for NIE Cable Laying.
Closure to operate: Overnight.  Diversion to operate, delays expected.
Alternative Route Via:Â A0026 UNION STREET, U3517 RAILWAY PLACE.
Closure to operate: Overnight.  Diversion to operate, delays expected.
Alternative Route Via:Â A0026 UNION STREET, U3517 RAILWAY PLACE.
07/07/2026 15:09:00 : ROADWORKS
A0057, Antrim Road, Templepatrick, - Lane Closure, A0057, Antrim Road, Templepatrick
Lane Closure required to Installing new gas connection to customers outside No.6.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
07/07/2026 15:05:00 : ROADWORKS
U0167, Bloomfield Road South, Bangor, - Lane Closure, U0167, Bloomfield Road South, Bangor
Lane Closure required to install new entrance at new Lidi store.
Closure to operate: Daily from Fri 10 Jul to Fri 07 Aug Traffic control to operate, delays expected.
Closure to operate: Daily from Fri 10 Jul to Fri 07 Aug Traffic control to operate, delays expected.
07/07/2026 15:02:00 : ROADWORKS
A0006, Shore Road, Jordanstown, - Lane Closure, A0006, Shore Road, Jordanstown
Lane Closure required for NI Water - Water Connx 32mm.Â
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
07/07/2026 15:01:00 : ROADWORKS
C0261, MAIN ROAD, Newtownards, - Lane Closure, C0261, MAIN ROAD, Newtownards
Lane Closure required for NIE Works.
Closure to operate: Daily 08:00 to 18:00 on Fri 17 Jul Traffic control to operate, delays expected.
Closure to operate: Daily 08:00 to 18:00 on Fri 17 Jul Traffic control to operate, delays expected.
07/07/2026 14:56:00 : ROADWORKS
A48, COTTON ROAD, Donaghadee, - Lane Closure, A48, COTTON ROAD, Donaghadee
Lane Closure required for Fibre install.
Closure to operate: Daily 09:30 to 16:30 on Thu 16 Jul Traffic control to operate, delays expected.
Closure to operate: Daily 09:30 to 16:30 on Thu 16 Jul Traffic control to operate, delays expected.
07/07/2026 14:48:00 : ROADWORKS
A22, Killinchy Road, Newtownards, - Lane Closure, A22, Killinchy Road, Newtownards
Lane Closure required for Frame and Cover.
Closure to operate: Daily 09:30 to 16:30 on Thu 16 Jul Traffic control to operate, delays expected.
Closure to operate: Daily 09:30 to 16:30 on Thu 16 Jul Traffic control to operate, delays expected.
07/07/2026 14:39:00 : ROADWORKS
U0044, Cogry Road, Doagh, - Road Closure, U0044, Cogry Road, Doagh
Road closure required to facilitate cable recovery for Openreach.Â
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U0045 RECTORY ROAD, C0039 BRIDGE ROAD.Diversion 2: C0039 BURNSIDE ROAD, C0039 BROOKFIELD ROAD, U0053 ORPINSMILL ROAD, C0037 SPRINGVALE ROAD, B0094 RASHEE ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U0045 RECTORY ROAD, C0039 BRIDGE ROAD.Diversion 2: C0039 BURNSIDE ROAD, C0039 BROOKFIELD ROAD, U0053 ORPINSMILL ROAD, C0037 SPRINGVALE ROAD, B0094 RASHEE ROAD.
07/07/2026 14:35:00 : ROADWORKS
U0036, Lisnalinchy Road, Ballyrobert, - Road Closure, U0036, Lisnalinchy Road, Ballyrobert
Road closure required for NIE Overhead Line Works.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U0036 LISNALINCHY ROAD, B0059 DOAGH ROAD, B0059 MOSSLEY ROAD, B0056 BALLYROBERT ROAD, U0039 BALLYLINNEY ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U0036 LISNALINCHY ROAD, B0059 DOAGH ROAD, B0059 MOSSLEY ROAD, B0056 BALLYROBERT ROAD, U0039 BALLYLINNEY ROAD.
07/07/2026 14:31:00 : ROADWORKS
A0054, Agivey Road, Kilrea, - Lane Closure, A0054, Agivey Road, Kilrea
Lane Closure required for BT Openreach New Connection.
Closure to operate: Daily.Traffic control to operate, delays expected.
Closure to operate: Daily.Traffic control to operate, delays expected.
07/07/2026 14:28:00 : ROADWORKS
B0119, Sea Road, Castlerock, - Road Closure, B0119, Sea Road, Castlerock
Road Closure Required for Temporary Footbridge Removal Works (Crane Erection & Removal).
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0119 SEA ROAD, U3561 CASTLE WALK, B0119 FREEHALL ROAD, U3561 MAIN STREET.Diversion 2: U3330 CIRCULAR ROAD.
Working hours will be as below.
Mon-Fri - 22:30 - 06:00 Sat 22:30 - 09:00 Sun 20:30 - 06:00
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0119 SEA ROAD, U3561 CASTLE WALK, B0119 FREEHALL ROAD, U3561 MAIN STREET.Diversion 2: U3330 CIRCULAR ROAD.
Working hours will be as below.
Mon-Fri - 22:30 - 06:00 Sat 22:30 - 09:00 Sun 20:30 - 06:00
07/07/2026 13:09:00 : ROADWORKS
C0549, Station Road, Maghera, - Lane Closure, C0549, Station Road, Maghera
Lane Closure required to facilitate work by NIE - NIE NetworksReason for closure: The closure is to assist with the installation of new NIE underground mainscables.
Closure to operate: Daily 09:30 to 16:30 from Mon 06 Jul 2026 to: Fri 24 Jul 2026 Traffic control to operate, delays expected.
07/07/2026 13:01:00 : ROADWORKS
U5124, Carraloan Road, Magherafelt, - Road Closure, U5124, Carraloan Road, Magherafelt
Road closure required to facilitate work by NIE - NIE Networks - NIE Tree Cutting.
Closure to operate: Daily 09:00 to 17:00 from Tue 21 Jul 2026 to: Tue 21 Jul 2026. Diversion control to operate, delays expected.
Alternative Route Via:Â Diversion 1: U5124 CARRALOAN ROAD, U5123 CARRALOAN ROAD, B0160 BALLYRONAN ROAD, U2226 OAKLEA ROAD, C0558 BALLYNAGARVE ROAD, U5125 LOVES ROAD.
07/07/2026 12:54:00 : ROADWORKS
B162, Lough Fea Road, Cookstown, - Lane Closure, B162, Lough Fea Road, Cookstown
Lane Closure required to facilitate work by Fibrus - Cabling, underground fibre blow, poling and tree trimming on the Fibrus Network.
Closure to operate: Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026. Diversion/Traffic control to operate, delays expected.
Notes:Road may have recently been surface dressed - no excavation works to take place without discussion with Section Office.
07/07/2026 12:47:00 : ROADWORKS
B0034, BALLYGAWLEY ROAD, BALLYGAWLEY, - Lane Closure, B0034, BALLYGAWLEY ROAD, BALLYGAWLEY, Dungannon
Lane Closure required to facilitate work by BT OpenreachReason for closure: Fibre install to customers house for Openreach
Closure to operate: Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Traffic control to operate, delays expected.
07/07/2026 12:36:00 : ROADWORKS
C0635, Annaghmakeown Road, Dungannon, - Road Closure, C0635, Annaghmakeown Road, Dungannon
Road closure required to facilitate work by BT OpenreachReason for closure: FRAME & COVER
Closure to operate: Daily 09:30 to 16:30 from Thu 16 Jul 2026 to: Thu 16 Jul 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0636 MAIN STREET, C0636 DRUMREANY ROAD, C0636 CASTLECAULFIELD ROAD, B0043 POMEROY ROAD, B0043 MAIN STREET, C0634 GORTNAGOLA ROAD, C0635 LURGYLEA ROAD, C0634 LURGYLEA ROAD, C0635 SESSIADONAGHY ROAD, U0906SESSIADONAGHY ROAD, U0906 CAPPAGH ROAD, C0635 null
07/07/2026 11:35:00 : ROADWORKS
A0026, Union Street, Coleraine, - Lane Closure (Diversion), A0026, Union Street, Coleraine
Lane Closure with Diversion required for NIE Cable Laying.
Closure to operate: Overnight.  Diversion to operate, delays expected.
Alternative Route Via:Â A0026 UNION STREET, A0026 RAILWAY ROAD, A0026 LODGE ROAD, A0029 RING ROAD, B0067 BALLYCASTLE ROAD.
Closure to operate: Overnight.  Diversion to operate, delays expected.
Alternative Route Via:Â A0026 UNION STREET, A0026 RAILWAY ROAD, A0026 LODGE ROAD, A0029 RING ROAD, B0067 BALLYCASTLE ROAD.
07/07/2026 11:15:00 : ROADWORKS
U3580, Brook Street, Coleraine, - Road Closure, U3580, Brook Street, Coleraine
Road closure required For Tree cutting works in line with NIE power shut off.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via: A3002 MILLBURN ROAD, A0026 UNION STREET, U3580 BROOK STREET.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via: A3002 MILLBURN ROAD, A0026 UNION STREET, U3580 BROOK STREET.
07/07/2026 10:43:00 : ROADWORKS
B0112, Main Street, Newry, - Road Closure, B0112, Main Street, Newry
Road closure required to facilitate DFI Southern with works.
Closure to operate: From 09:30 on Monday 27 July 2026 to 16:30 on Friday 21 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â B0133 MILLVALE ROAD, A0025 CAMLOUGH ROAD, A0025 NEWRY ROAD, A0025 MAIN STREET, C0174 QUARTER ROAD, C0174 MCCLENAGHANS HILL, C0174 CONVENT HILL.
Closure to operate: From 09:30 on Monday 27 July 2026 to 16:30 on Friday 21 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â B0133 MILLVALE ROAD, A0025 CAMLOUGH ROAD, A0025 NEWRY ROAD, A0025 MAIN STREET, C0174 QUARTER ROAD, C0174 MCCLENAGHANS HILL, C0174 CONVENT HILL.
06/07/2026 13:21:00 : ROADWORKS
U9425, Drumgoon Road, Maguiresbridge, - Lane Closure, U9425, Drumgoon Road, Maguiresbridge
Lane Closure required to facilitate work by NI Water Capital - Installation of CIPP Liner from existing sewer manholes
Closure to operate: Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Wed 22 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
06/07/2026 13:19:00 : ROADWORKS
U2135, Quarrytown Road, Ballymena, - Road Closure, U2135, Quarrytown Road, Ballymena
Road closure required for NIE Overhead Line Work.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0094 KNOCKAN ROAD, A0043 CUSHENDALL ROAD, U2135 QUARRYTOWN ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â B0094 KNOCKAN ROAD, A0043 CUSHENDALL ROAD, U2135 QUARRYTOWN ROAD.
06/07/2026 13:11:00 : ROADWORKS
A0002, Circular Road, Larne, - Lane Closure, A0002, Circular Road, Larne
Lane Closure required for NI Water - Replace or Relevel SV AV FH Box.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
06/07/2026 12:37:00 : ROADWORKS
B52, Lattone Roaad, Scribbagh, Garrison, - Lane Closure, B52, Lattone Roaad, Scribbagh, Garrison
Lane Closure required to facilitate work by BT Openreach
Closure to operate: Daily 09:30 to 16:30 from Thu 23 Jul 2026 to: Thu 23 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
06/07/2026 12:31:00 : ROADWORKS
A1 Dromore Northbound closed @ Banbridge Road , A1, Dromore
Road closure required to facilitate Principle Bridge inspections
Closure to operate: overnight only Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Banbridge Road off slip, Banbridge Road. Church Street, Market Square, Princes Street & Hillsborough Road to A1 Northbound
06/07/2026 12:22:00 : ROADWORKS
B161, Mountjoy Road, Clonoe, - Lane Closure, B161, Mountjoy Road, Clonoe
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes) - Carriageway Patching.
Closure to operate: Daily 08:00 to 18:00 from Sun 05 Jul 2026 to: Fri 31 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
06/07/2026 12:21:00 : ROADWORKS
A1 Dromore Southbound closure @ Hillsborough Road , Dromore
Road closure required to facilitate Principle Bridge Inspections
Closure to operate: overnight only Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â Hillsborough Road Southbound off slip, Hillsborough Road, Princes Street, Market Square, Church Street & Banbridge Road to A1 Southbound
06/07/2026 12:17:00 : ROADWORKS
A47, Boa Island Road, Enniskillen, - Lane Closure, A47, Boa Island Road, Enniskillen
Lane Closure required to facilitate work by BT Openreach - BT POLING WORKS.
Closure to operate: Daily 09:30 to 16:30 from Thu 23 Jul 2026 to: Thu 23 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
06/07/2026 10:30:00 : ROADWORKS
A6, Foreglen Road, Dungiven, (Westbound) - Road Closure, A6, Foreglen Road, Dungiven
Road closure required for NIE Overhead Line Work.
Closure to operate: Overnight Only. Diversion to operate, delays expected.
Alternative Route Via: Feeny Road - Foreglen Road - Baranailt Road.
Closure to operate: Overnight Only. Diversion to operate, delays expected.
Alternative Route Via: Feeny Road - Foreglen Road - Baranailt Road.
06/07/2026 10:16:00 : ROADWORKS
U3534, Kinora Terrace, Portstewart, - Road Closure, U3534, Kinora Terrace, Portstewart
Road closure required for a firework display requires an exclusion zone. As Atlantic Circle Car park is closed all day, signage is needed to stop large vehicles entering the Atlantic Circle.
Closure to operate: Operational Continuous.  Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U3534 ATLANTIC COVE, U3534 ATLANTIC CIRCLE.
Closure to operate: Operational Continuous.  Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U3534 ATLANTIC COVE, U3534 ATLANTIC CIRCLE.
06/07/2026 10:10:00 : ROADWORKS
M2 Motorway Northbound, Newtownabbey, - Road Closure, M2 Motorway Northbound, Newtownabbey
Road closure required for DBFO1 Major Maintenance - Resurfacing.
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via:Â Â M0002 M2 MOTORWAY (SOUTH BOUND).
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via:Â Â M0002 M2 MOTORWAY (SOUTH BOUND).
06/07/2026 10:06:00 : ROADWORKS
M2 Motorway Northbound, Templepatrick, - Road Closure, M2 Motorway Northbound, Templepatrick
Road closure required to DBFO1 Major Maintenance - resurfacing.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â M0002 M2 TEMPLEPATRICK INTERCHANGE OFF-SLIP ROAD (SOUTH BOUND), A0057 BALLYCLARE ROAD, A0006 ANTRIM ROAD.
Closure to operate: Overnight. Diversion to operate, delays expected.
Alternative Route Via:Â M0002 M2 TEMPLEPATRICK INTERCHANGE OFF-SLIP ROAD (SOUTH BOUND), A0057 BALLYCLARE ROAD, A0006 ANTRIM ROAD.
06/07/2026 10:01:00 : ROADWORKS
A0042, Portglenone Road, Antrim, - Lane Closure, A0042, Portglenone Road, Ahoghill
Lane Closure required for Full-Service Water Connection (2.6m Excavation).
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
06/07/2026 09:59:00 : ROADWORKS
A0044, Drones Road, Ballymoney, - Lane Closure, A0044, Drones Road, Ballymoney
Lane Closure required for Fibre install to customers house, No.66 Drones Road.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
06/07/2026 09:57:00 : ROADWORKS
C0034, Jordanstown Road, Newtownabbey, - Road Closure, C0034, Jordanstown Road, Newtownabbey
Road closure required for NI Railway bridge maintenance.
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via: C0034 JORDANSTOWN ROAD, C0035 MONKSTOWN ROAD, B0059 DOAGH ROAD, B0513 STATION ROAD, A0002 SHORE ROAD.
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via: C0034 JORDANSTOWN ROAD, C0035 MONKSTOWN ROAD, B0059 DOAGH ROAD, B0513 STATION ROAD, A0002 SHORE ROAD.
06/07/2026 09:56:00 : ROADWORKS
M2 Sandyknowes Roundabout Onslip Road, - Road Closure, M2 Sandyknowes Roundabout Onslip Road (Northbound)
Road closure required for DBFO1 Major Maintenance - Resurfacing.
Closure to operate: Operational Continuous.  Diversion to operate, delays expected.
Alternative Route Via:Â A0006 ANTRIM ROAD, A0006 BALLYCLARE ROAD, A0057 BALLYCLARE ROAD.
Closure to operate: Operational Continuous.  Diversion to operate, delays expected.
Alternative Route Via:Â A0006 ANTRIM ROAD, A0006 BALLYCLARE ROAD, A0057 BALLYCLARE ROAD.
06/07/2026 09:52:00 : ROADWORKS
M2 Motorway (Southbound), Templepatrick, - Lane Closure, M2 Motorway (Southbound), Templepatrick
Lane Closure required for DBFO1 Major Maintenance - Resurfacing.
Closure to operate: Continuously.Â
Closure to operate: Continuously.Â
06/07/2026 09:50:00 : ROADWORKS
M2 Motorway (Northbound), Newtownabbey, - Road Closure, M2 Motorway (Northbound), Newtownabbey
Road closure required for DBFO1 Major Maintenance - Resurfacing.
Closure to operate: Ovenright. Diversion to operate, delays expected.
Alternative Route Via:Â M0002 M2 SANDYKNOWES RBT OFF-SLIP ROAD (NORTH BOUND), A0006 ANTRIM ROAD, A0006 BALLYCLARE ROAD, A0057 BALLYCLARE ROAD.
Closure to operate: Ovenright. Diversion to operate, delays expected.
Alternative Route Via:Â M0002 M2 SANDYKNOWES RBT OFF-SLIP ROAD (NORTH BOUND), A0006 ANTRIM ROAD, A0006 BALLYCLARE ROAD, A0057 BALLYCLARE ROAD.
06/07/2026 09:47:00 : ROADWORKS
C0091, Balnamore Road, Ballymoney, - Road Closure, C0091, Balnamore Road, Ballymoney
Road closure required for Railway Level Crossing Repair.
Closure to operate: Overnight Only. Diversion to operate, delays expected.
Alternative Route Via:Â U4131 BALLYBRAKES ROAD, B0062 MILLTOWN ROAD, B0062 GATE END, B0062 CASTLE STREET, B0062 MEETING HOUSE STREET, B0147 NEWAL ROAD, B0062 QUEEN STREET, B0062 VICTORIA STREET, U4550 LINENHALL STREET, C0091 HIGH STREET, C0091 CHARLOTTE STREET, C0091 BALNAMORE ROAD.
Closure to operate: Overnight Only. Diversion to operate, delays expected.
Alternative Route Via:Â U4131 BALLYBRAKES ROAD, B0062 MILLTOWN ROAD, B0062 GATE END, B0062 CASTLE STREET, B0062 MEETING HOUSE STREET, B0147 NEWAL ROAD, B0062 QUEEN STREET, B0062 VICTORIA STREET, U4550 LINENHALL STREET, C0091 HIGH STREET, C0091 CHARLOTTE STREET, C0091 BALNAMORE ROAD.
03/07/2026 15:37:00 : ROADWORKS
M2 Motorway Northbound, Newtownabbey, - Lane Closure, M2 Motorway Northbound, Newtownabbey
Lane Closure required for DBFO1 Major Maintenance.
Closure to operate: Overnight Eachnight.
Closure to operate: Overnight Eachnight.
03/07/2026 13:03:00 : ROADWORKS
A0029, Ranfurly Road, Dungannon, - One Way closure, A0029, Ranfurly Road, Dungannon
Road closure required to facilitate work by EvolveReason for closure: Installation of new gas mains
Closure to operate: Tue 14 Jul 2026 to: Sun 02 Aug 2026 Diversion to operate, delays expected.
Alternative Route Via:Diversion 1: A0045 WELLINGTON ROAD, A0045 BROOKE STREET, A0045 MILLTOWN STREET,A0045 MILLTOWN, A0045 RAILWAY ROAD, U7502 RAILWAY ROAD, A0045 BALLYGAWLEYROAD, B0043 NEWELL ROAD, B0043 MULLAGHMORE ROAD, U7514 QUARRY LANE, U7514 OAKLAND AVENUE, A0029 CARLAND ROAD, A0029 CIRCULAR ROADDiversion 2: U7522 GORTMERRON LINK, U7522 GORTMERRON LINK ROAD, B0034 KILLYMANROAD
03/07/2026 12:59:00 : ROADWORKS
A0029, Moy Road, Craigavon, - Lane Closure, A0029, Moy Road, Craigavon
Lane Closure required to facilitate work by BT OpenreachReason for closure: To facilitate cable recovery for Openreach
Closure to operate:Â Sun 19 Jul 2026 to: Sun 19 Jul 2026
Traffic control to operate, delays expected.
03/07/2026 09:57:00 : ROADWORKS
U4085, Riverdale, Larne, - Road Closure, U4085, Riverdale, Larne
Road closure required for demolition of a tower block.
Closure to operate: Continuously  Diversion to operate, delays expected.
Alternative Route Via:Â U4085 RIVERDALE, U4085 HIGH STREET, U4105 POUND STREET.
Closure to operate: Continuously  Diversion to operate, delays expected.
Alternative Route Via:Â U4085 RIVERDALE, U4085 HIGH STREET, U4105 POUND STREET.
02/07/2026 17:12:00 : ROADWORKS
U2202, Ballyguddin Road, Dungiven, - One Way Closure, U2202, Ballyguddin Road, Dungiven
One Way Closure required for Charity Tractor Pull.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2202 BALLYGUDDIN ROAD, B0192 DRUMRANE ROAD, C0522 ALTMOVER ROAD.
The One Way Closure will be in place at the times listed below.
Friday 17th July 2026 8am - 11pmSaturday 18th July 2026 8am - 11pmSunday 19th July 2026 9am - 9pm
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2202 BALLYGUDDIN ROAD, B0192 DRUMRANE ROAD, C0522 ALTMOVER ROAD.
The One Way Closure will be in place at the times listed below.
Friday 17th July 2026 8am - 11pmSaturday 18th July 2026 8am - 11pmSunday 19th July 2026 9am - 9pm
02/07/2026 16:49:00 : ROADWORKS
ROAD CLOSED - DIVERSION IN PLACE, B23, Ballylesson Road, Lisburn
Road closure required for fibre installation.
Closure to operate: Off-peak. Diversion to operate, delays expected.
Alternative Route Via:Â B205 PURDYSBURN HILL, B23 BALLYLESSON ROAD.
Closure to operate: Off-peak. Diversion to operate, delays expected.
Alternative Route Via:Â B205 PURDYSBURN HILL, B23 BALLYLESSON ROAD.
02/07/2026 16:45:00 : ROADWORKS
ROAD CLOSED - DIVERSION IN PLACE, U60, Halfpenny Gate Road, Moira, Craigavon
Road closure required for carriageway resurfacing.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Lurganure Road - Church Lane - A3 Moira Road - A3 Lisburn Road - Damhead Road.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â Lurganure Road - Church Lane - A3 Moira Road - A3 Lisburn Road - Damhead Road.
02/07/2026 16:40:00 : ROADWORKS
LANE CLOSURE, A26, Moira Road at Crewe Park Road, Crumlin
Lane Closure required for overhead line works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
02/07/2026 16:37:00 : ROADWORKS BELFAST
LANE CLOSURE, A20, Upper Newtownards Road, Belfast
Lane Closure required for excavating a track.
Closure to operate: Continuously. Traffic control to operate, delays expected.
Closure to operate: Continuously. Traffic control to operate, delays expected.
02/07/2026 16:36:00 : ROADWORKS
A0005, Curr Road, OMAGH, - Lane Closure, A0005, Curr Road, OMAGH
Lane Closure required to facilitate work by BT OpenreachReason for closure: Renew frame and cover
Closure to operate: Tue 21 Jul 2026 to: Tue 21 Jul 2026. Traffic control to operate, delays expected.
02/07/2026 16:33:00 : ROADWORKS
LANE CLOSURE, A3, Main Street, Craigavon
Lane Closure required for lane narrowing.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
02/07/2026 16:27:00 : ROADWORKS
LANE CLOSURE, A3, Moira Road, Lisburn
Lane Closure required for cabling works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
02/07/2026 16:26:00 : ROADWORKS
C0625, Old Mountfield Road, Omagh, - Lane Closure, C0625, Old Mountfield Road, Omagh
Lane Closure required to facilitate work by John McQuillan ContractsReason for closure: Gortin Road Scheme
Closure to operate: Fri 26 Jun 2026 to: Fri 28 Aug 2026. Traffic control to operate, delays expected.
02/07/2026 16:19:00 : ROADWORKS
B48, MOUNTJOY ROAD, OMAGH, Omagh, - Lane Closure, B48, MOUNTJOY ROAD, OMAGH, Omagh
Lane Closure required to facilitate work by John McQuillan ContractsReason for closure: Gortin Road Scheme
Closure to operate: Fri 26 Jun 2026 to: Fri 28 Aug 2026 Traffic control to operate, delays expected.
02/07/2026 16:08:00 : ROADWORKS
A0515, Madam's Bank Road, Londonderry, - Lane Closure, A0515, Madam's Bank Road, Londonderry
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: Relining the carriageway
Closure to operate: Mon 06 Jul 2026 to: Fri 24 Jul Traffic control to operate, delays expected.
02/07/2026 16:01:00 : ROADWORKS
A0038, Lifford Road, STRABANE, - Lane Closure, A0038, Lifford Road, STRABANE
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: bridge inspection
Closure to operate:Tue 07 Jul 2026 to: Thu 16 Jul 2026
Traffic control to operate, delays expected.
02/07/2026 15:50:00 : ROADWORKS
A0005, VICTORIA ROAD, MAGHERAMASON, - Lane Closure, A0005, VICTORIA ROAD, MAGHERAMASON, Londonderry
Lane Closure required to facilitate work by NI Water OperationsReason for closure: New Storm connection for housing development
Closure to operate: Daily 09:30 to 16:30 from Tue 14 Jul 2026 to: Fri 17 Jul 2026 Traffic control to operate, delays expected.
02/07/2026 14:59:00 : ROADWORKS
U0125, Old Grand Jury Road, Ballynahinch, - Road Closure, U0125, Old Grand Jury Road, Ballynahinch
Road closure required to facilitate DFI Southern with works.
Closure to operate: From 09:30 on Monday 20 July 2026 to 16:30 on Friday 14 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â U0125 DOWNPATRICK STREET, A0021 MAIN STREET, A0007 CROSSGAR ROAD.
Closure to operate: From 09:30 on Monday 20 July 2026 to 16:30 on Friday 14 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â U0125 DOWNPATRICK STREET, A0021 MAIN STREET, A0007 CROSSGAR ROAD.
02/07/2026 14:30:00 : ROADWORKS
A0046, Lough Shore Road, Enniskillen, - Lane Closure, A0046, Lough Shore Road, Enniskillen
Lane Closure required to facilitate work by NI Water CapitalReason for closure: New watermains installation on behalf of NI Water
Closure to operate: Mon 13 Jul 2026 to: Fri 27 Nov 2026. Traffic control to operate, delays expected.The anticipated delay will be 5 - 15 minutes
02/07/2026 14:24:00 : ROADWORKS
A0004, Sligo Road, - Lane Closure, A0004, Sligo Road
Lane Closure required to facilitate work by FibrusReason for closure: Testing, Rodding & Roping, Civils to clear blockages and Cabling on the FibrusNetworkClosure to operate: Daily 09:30 to 16:30 from Wed 15 Jul 2026 to: Fri 17 Jul 2026
Traffic control to operate, delays expected.
02/07/2026 11:11:00 : ROADWORKS
LANE CLOSURE, A3, Moira Road, Lisburn
Lane Closure required for repair of defective apparatus.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
02/07/2026 11:05:00 : ROADWORKS BELFAST
LANE CLOSURE, B23, Upper Malone Road, Belfast
Lane Closure required for telecom works.
Closure to operate: Off-peak Traffic control to operate, delays expected.
Closure to operate: Off-peak Traffic control to operate, delays expected.
02/07/2026 11:01:00 : ROADWORKS BELFAST
LANE CLOSURE, A55, Knock Road, Belfast
Lane Closure required for telecoms works.
Closure to operate:Â Daily - Off-peak.
Traffic control to operate, delays expected.
Closure to operate:Â Daily - Off-peak.
Traffic control to operate, delays expected.
01/07/2026 14:34:00 : ROADWORKS
A0026, Lodge Road, Coleraine, - One Way Closure, A0026, Lodge Road, Coleraine
One Way Closure required for Sewer Connection.
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A0026 NURSERY AVENUE, A0026 BERESFORD ROAD, A0026 TERRACE ROW, C0091 MOUNTSANDEL ROAD, C0091 RUGBY AVENUE.
Diversion 2: A0026 UNION STREET, A0026 RAILWAY ROAD, B0067 BALLYCASTLE ROAD, A0029 RING ROAD.
Closure to operate: Continuously. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A0026 NURSERY AVENUE, A0026 BERESFORD ROAD, A0026 TERRACE ROW, C0091 MOUNTSANDEL ROAD, C0091 RUGBY AVENUE.
Diversion 2: A0026 UNION STREET, A0026 RAILWAY ROAD, B0067 BALLYCASTLE ROAD, A0029 RING ROAD.
01/07/2026 14:17:00 : ROADWORKS
A0042, Galgorm Road, Ballymena, - Road Closure, A0042, Galgorm Road, Ballymena
Road closure required for Resurfacing for DFI Roads.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2031 OLD GALGORM ROAD.
Closure to operate: Daily. Diversion to operate, delays expected.
Alternative Route Via:Â U2031 OLD GALGORM ROAD.
01/07/2026 13:04:00 : ROADWORKS
A29, Moy Road, Armagh, - Lane Closure, A29, Moy Road, Armagh
Lane Closure required to facilitate DFI South with works.
Closure to operate:From 09:30 on Monday 27th July to 16:30 on Friday 21 August 2026. Traffic control to operate, delays expected.
Closure to operate:From 09:30 on Monday 27th July to 16:30 on Friday 21 August 2026. Traffic control to operate, delays expected.
01/07/2026 12:46:00 : ROADWORKS
B0194, RACECOURSE ROAD, LONDONDERRY, - Lane Closure, B0194, RACECOURSE ROAD, LONDONDERRY, Londonderry
Lane Closure required to facilitate work by NI Water CapitalReason for closure: Watermain pipelaying for NIW
Closure to operate: Thur 27 Jul 2026 to: Fri 28 Aug 2026 Traffic control to operate, delays expected.
01/07/2026 12:45:00 : ROADWORKS
A0042, Parkway, Ballymena, - Lane Closure, A0042, Parkway, Ballymena
Lane Closure required to facilitate parking for Openreach to carry out their works.
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
01/07/2026 12:39:00 : ROADWORKS
A1002, BRIDGE STREET, Londonderry, - One Way closure, A1002, BRIDGE STREET, LONDONDERRY, Londonderry
Road closure required to facilitate work by NI Water CapitalReason for closure: Slip lane closure to enable access for materials and equipment to replace NIWTrunk MainClosure to operate: Sat 01 Aug 2026 to: Fri 04 Sep 2026 Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CRAIGAVON BRIDGE LOWER, A1002 DUKE STREET, A0005 VICTORIAROAD, A1002 VICTORIA ROAD LINK
01/07/2026 12:16:00 : ROADWORKS
A0002, Larne Road, Carrickfergus, - Lane Closure, A0002, Larne Road, Carrickfergus
Lane Closure required for BT Openreach New Connection.
Closure to operate: Daily.Traffic control to operate, delays expected.
Closure to operate: Daily.Traffic control to operate, delays expected.
01/07/2026 12:16:00 : ROADWORKS
A1002, WATERSIDE LINK, LONDONDERRY, - Lane Closure, A1002, WATERSIDE LINK, LONDONDERRY, Londonderry
Lane Closure required to facilitate work by AdmanReason for closure: To facilitate surfacing at entrance to Ebrington Square
Closure to operate: Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026 Traffic control to operate, delays expected.
01/07/2026 12:11:00 : ROADWORKS
B0046, Creggan Road, Omagh, - Road Closure, B0046, Creggan Road, Omagh
Road closure required to facilitate work by NIE - NIE NetworksReason for closure: NIE Overhead Line Works
Closure to operate:Â Daily 09:00 to 17:00 from Thu 23 Jul 2026 to: Thu 23 Jul 2026
Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: B0046 CREGGAN ROAD, A0505 BARONY ROAD, C0554 GREENCASTLE ROAD, B0046 CROCKANBOY ROAD
01/07/2026 12:06:00 : ROADWORKS
A0043, Cushendall Road, Ballymena, - Lane Closure, A0043, Cushendall Road, Ballymena
Lane Closure required for Testing, Rodding and Roping with possible minor excavation on the Fibrus Network.Â
Closure to operate: Daily. Traffic control to operate, delays expected.
Closure to operate: Daily. Traffic control to operate, delays expected.
01/07/2026 11:50:00 : ROADWORKS BELFAST
LANE CLOSURE, A501, Falls Road , Belfast
Lane Closure required to renew cabinet doors.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
01/07/2026 11:47:00 : ROADWORKS BELFAST
LANE CLOSURE, B503, Sandy Row, Belfast
Lane Closure required for NI Water - to replace manhole cover and frame.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
01/07/2026 11:10:00 : ROADWORKS
LANE CLOSURE, A3, Moira Road, Lisburn
Lane Closure required for installation of services and ducting for new housing development.
Temporary Traffic Management - 2-way temporary traffic signals in operation.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
Temporary Traffic Management - 2-way temporary traffic signals in operation.
Closure to operate: Continuously.  Traffic control to operate, delays expected.
01/07/2026 10:12:00 : ROADWORKS
C0281, Scotch Street, Downpatrick, - Lane Closure, C0281, Scotch Street, Downpatrick
Lane Closure required to facilitate NI Water Capital.
Closure to operate: Continuous Closure from Monday 20 July 2026 to Friday 28 August 2026. Traffic control to operate, delays expected.
Closure to operate: Continuous Closure from Monday 20 July 2026 to Friday 28 August 2026. Traffic control to operate, delays expected.
30/06/2026 16:47:00 : ROADWORKS
LANE CLOSURE, A3, Moira Road , Lisburn
Lane Closure required for NIE excavation works.
Closure to operate:Â Continuously.
Traffic control to operate, delays expected.
Closure to operate:Â Continuously.
Traffic control to operate, delays expected.
30/06/2026 16:29:00 : ROADWORKS
A1002, WATERSIDE LINK, LONDONDERRY, - Lane Closure, A1002, WATERSIDE LINK, LONDONDERRY, Londonderry
Lane Closure required to facilitate work by AdmanReason for closure: To facilitate surfacing at entrance to Ebrington Square
Closure to operate: Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Mon 27 Jul 2026 Traffic control to operate, delays expected.
30/06/2026 16:23:00 : ROADWORKS
A0005, VICTORIA ROAD, BREADY, Strabane, - Lane Closure, A0005, VICTORIA ROAD, BREADY, Strabane
Lane Closure required to facilitate work by FibrusReason for closure: Testing, Rodding and Roping, possible minor excavation, cabling & splicing onthe Fibrus Network.
Closure to operate: Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Fri 24 Jul 2026 Traffic control to operate, delays expected.
30/06/2026 16:16:00 : ROADWORKS
B0072, Railway Street, Strabane, - Lane closure, B0072, Railway Street, Strabane
Lane Closure required to facilitate work by FP McCannReason for closure: Strabane Public Realm.
Closure to operate: Mon 20 Jul 2026 to: Sat 31 Oct 2026. Traffic control to operate, delays expected.The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: B0072 ABERCORN SQUARE, B0072 RAILWAY STREET, B0072 MARKET STREET, B0072 MAIN STREET, B0072 BRIDGE STREET, B0072 BRADLEY WAY, A0005 VICTORIA ROADDiversion 2: B0072 RAILWAY STREET
30/06/2026 16:06:00 : ROADWORKS
A0005, Melmount Road, Strabane, - Lane Closure, A0005, Melmount Road, Strabane
Lane Closure required to facilitate work by BT OpenreachReason for closure: To facilitate cable recovery for Openreach
Closure to operate: Daily 09:30 to 16:30 from Mon 27 Jul 2026 to: Fri 31 Jul 2026 Traffic control to operate, delays expected.
30/06/2026 16:02:00 : ROADWORKS
C0653, ALTADAVEN ROAD, AUGHER, Augher, - Road Closure, C0653, ALTADAVEN ROAD, AUGHER, Augher
D
Road closure required to facilitate work by NI Water OperationsReason for closure: Installation of Replacement 180mm Watermain
Closure to operate: Mon 20 Jul 2026 to: Fri 14 Aug 2026 Diversionl to operate, delays expected.The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: A0028 FAVOUR ROYAL ROAD, U1330 ALTNAVEAGH ROAD, U0422 ALTNAVEAGH ROAD, U0422 DERRYCLOONY ROAD, U0421 AGHINDARRAGH ROAD
Road closure required to facilitate work by NI Water OperationsReason for closure: Installation of Replacement 180mm Watermain
Closure to operate: Mon 20 Jul 2026 to: Fri 14 Aug 2026 Diversionl to operate, delays expected.The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: A0028 FAVOUR ROYAL ROAD, U1330 ALTNAVEAGH ROAD, U0422 ALTNAVEAGH ROAD, U0422 DERRYCLOONY ROAD, U0421 AGHINDARRAGH ROAD
30/06/2026 15:49:00 : ROADWORKS
A0042, Galgorm Road, Ballymena, - Lane Closure, A0042, Galgorm Road, Ballymena
Lane Closure required for Ducting Road Crossing.
Closure to operate: Overnight.
Traffic control to operate, delays expected.
Closure to operate: Overnight.
Traffic control to operate, delays expected.
30/06/2026 13:05:00 : ROADWORKS
U5055, Goragh Road, Newry, - Lane Closure, U5055, Goragh Road, Newry
Lane Closure required to facilitate Adman LTD with works.
Closure to operate from 23:00 on Wednesday 29th July 2026 to 06:00 on Thursday 30th July 2026. Traffic control to operate, delays expected.
30/06/2026 12:57:00 : ROADWORKS
A0003, Parkview Street, Craigavon, - Lane Closure, A0003, Parkview Street, Craigavon
Lane closure from 75m east from 18 Parkview Street to 75m west from 18 Parkview Street.
This will be operational from 09:30 to 16:30 on Tue 21 Jul 2026.
The closure is to facilitate work by NI Water Operations
The anticipated delay will be 5 - 15 minutes
This will be operational from 09:30 to 16:30 on Tue 21 Jul 2026.
The closure is to facilitate work by NI Water Operations
The anticipated delay will be 5 - 15 minutes
30/06/2026 12:57:00 : ROADWORKS BELFAST
B7, Ballynahinch Road, Downpatrick, - Road Closure, B7, Ballynahinch Road, Downpatrick
Road closure required to facilitate C O'Neill Event Solutions with works.
Closure to operate: from 09:00 on Monday 20th July 2026 to 19:00 on Friday 14th August 2026. Diversion to operate, delays expected.
Alternative Route Via:Â B0007 BALLYNAHINCH ROAD, U0366 BALLYNAHINCH ROAD, B0007 CROSSGARROAD, A0024 MAIN STREET, A0024 CHURCH STREET, U6105 HARMONY ROAD, U6105WINDMILL STREET, U6105 THE SQUARE, A0024 HIGH STREET, A0024 CHURCH ROAD, A0024DRUMANESS ROAD, B0002 DOWNPATRICK ROAD, B0002 ANNACLOY ROAD, A0007 BELFASTROAD, A0007 DOWNPATRICK ROAD, A0007 SAINTFIELD ROAD, A0007 DOWNPATRICKSTREET.
30/06/2026 12:50:00 : ROADWORKS
LANE CLOSURE, A23, Ballygowan Road, Crossnacreevy
Lane Closure required for carriageway resurfacing works.
Closure to operate:Â Daily - Off-peak.
Traffic control to operate, delays expected.
Closure to operate:Â Daily - Off-peak.
Traffic control to operate, delays expected.
30/06/2026 12:23:00 : ROADWORKS
U5345, Low Road, Newry, - Lane Closure, U5345, Low Road, Newry
Lane Closure required to facilitate Adman Ltd with works.
Closure to operate: From 11:00pm on Tuesday 28 Jul 2026 to 6:00AM on Wednesday 29th July 2026 Traffic control to operate, delays expected.
Closure to operate: From 11:00pm on Tuesday 28 Jul 2026 to 6:00AM on Wednesday 29th July 2026 Traffic control to operate, delays expected.
30/06/2026 12:09:00 : ROADWORKS
C0218, Chancellors Road, Newry, - Lane Closure, C0218, Chancellors Road, Newry
Lane Closure required to facilitate Adman LTD with works.
Closure to operate: From 23:00 on Tuesday 28 July 2026 to 6:00 on Wednesday 29 July 2026. Traffic control to operate, delays expected.
Closure to operate: From 23:00 on Tuesday 28 July 2026 to 6:00 on Wednesday 29 July 2026. Traffic control to operate, delays expected.
30/06/2026 12:05:00 : ROADWORKS
A1, Trevor Hill, Newry, - Road Closure, A1, Trevor Hill, Newry
Road closure required to facilitate NI Water with works.
Closure to operate: From 07:00 on Sunday 19 July 2026 to 12:00PM on Sunday 19 July 2026 Diversion to operate, delays expected.
Alternative Route Via:A0001 TREVOR HILL, A0027 KILDARE STREET, A0027 THE MALL, U6284 THE MALL, U6284 ST. MARYS STREET, A0001 WILLIAM STREET, A0001 ABBEY WAY, A0001 UPPER WATER STREET.
Closure to operate: From 07:00 on Sunday 19 July 2026 to 12:00PM on Sunday 19 July 2026 Diversion to operate, delays expected.
Alternative Route Via:A0001 TREVOR HILL, A0027 KILDARE STREET, A0027 THE MALL, U6284 THE MALL, U6284 ST. MARYS STREET, A0001 WILLIAM STREET, A0001 ABBEY WAY, A0001 UPPER WATER STREET.
30/06/2026 11:59:00 : ROADWORKS
B7, Ballynahinch Road, Downpatrick, - Lane Closure, B7, Ballynahinch Road, Downpatrick
Lane closure required to facilitate C O'Neill Event Solutions with works.
Closure to operate: From 07:00 on Monday 20 July 2026 to 09:00 on Friday 14 August 2026.
Traffic control in place.
Closure to operate: From 07:00 on Monday 20 July 2026 to 09:00 on Friday 14 August 2026.
Traffic control in place.
30/06/2026 11:47:00 : ROADWORKS
LANE CLOSURE, B101, Pond Park Road, Lisburn
Lane Closure required to repair defective apparatus.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
30/06/2026 11:43:00 : ROADWORKS BELFAST
LANE CLOSURE, A55, Stockmans Lane, Belfast
Lane Closure required for a new gas connection.
Closure to operate: Daily.  Traffic control to operate, delays expected.
Closure to operate: Daily.  Traffic control to operate, delays expected.
30/06/2026 10:57:00 : ROADWORKS BELFAST
LANE CLOSURE, B23, Malone Road, Belfast
Lane Closure required to facilitate cable recovery for Openreach
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
30/06/2026 10:54:00 : ROADWORKS BELFAST
LANE CLOSURE, B23, Malone Road, Belfast
Lane Closure required to facilitate cable recovery for Openreach.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
30/06/2026 10:46:00 : ROADWORKS
U6281, Martins Lane newry, Newry, - Road Closure, U6281, Martins Lane newry, Newry
Road closure required to facilitate Adman LTD with works.
Closure to operate: From  23:00 on Tuesday 28th July 2026 to 06:00 on Wednesday 29th July 2026.Â
Traffic control to operate, delays expected.
Closure to operate: From  23:00 on Tuesday 28th July 2026 to 06:00 on Wednesday 29th July 2026.Â
Traffic control to operate, delays expected.
30/06/2026 10:39:00 : ROADWORKS BELFAST
LANE CLOSURE, A2, Middlepath Street, Belfast
Lane Closure required for NI Railway bridge maintenance.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
29/06/2026 15:59:00 : ROADWORKS BELFAST
LANE CLOSURE, A55, Knock Road, Belfast
Lane Closure required for telecom works.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
29/06/2026 15:56:00 : ROADWORKS BELFAST
LANE CLOSURE, A55, Knock Road, Belfast
Lane Closure required for telecom works.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
29/06/2026 15:53:00 : ROADWORKS BELFAST
LANE CLOSURE, B23, Malone Road, Belfast
Lane Closure required for telecoms works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
29/06/2026 11:49:00 : ROADWORKS BELFAST
LANE 1 CLOSURE, A501, FALLS ROAD BELFAST AT BROADWAY, Belfast
Lane Closure required for a repair on behalf of NI Water - leak on supply
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
26/06/2026 16:33:00 : ROADWORKS
B46, Carnalea Road, Seskinore, - Lane Closure, B46, Carnalea Road, Seskinore
Lane Closure required to facilitate work by BT Openreach - Fibre install to customers house, 92 Carnalea Road.
Closure to operate: Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Mon 20 Jul 2026 Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
26/06/2026 11:33:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, A24, Belfast
Lane Closure required for telecoms works - maintenance to phone mast.
Temporary traffic management - Lane 1 closure City bound and footway closure with pedestrian diversion.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
Temporary traffic management - Lane 1 closure City bound and footway closure with pedestrian diversion.
Closure to operate: Daily - Off-peak. Traffic control to operate, delays expected.
26/06/2026 11:28:00 : ROADWORKS
LANE CLOSURE, A30, Glenavy Road, Lisburn
Lane Closure required for BT poling works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
26/06/2026 11:19:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Ormeau Road at Galwally Park, Belfast
Lane Closure required for frame and cover.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
26/06/2026 11:14:00 : ROADWORKS
U1271, CIRCULAR ROAD, OMAGH, Omagh, - Road Closure, U1271, CIRCULAR ROAD, OMAGH, Omagh
Road closure required to facilitate work by NIE - NIE NetworksReason for closure: NIE Cable laying works
Closure to operate: Mon 06 Jul 2026 to: Fri 28 Aug 2026 Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: U1271 ST. JULIANS ROAD, U1269 KILLYBRACK ROAD
26/06/2026 11:08:00 : ROADWORKS
U1271, Saint Julians Road, Omagh, - Road Closure, U1271, Saint Julians Road, Omagh
Road closure required to facilitate work by NIE - NIE NetworksReason for closure: NIE Cable laying works
Closure to operate: Mon 06 Jul 2026 to: Fri 28 Aug 2026 Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: U1271 CIRCULAR ROAD, C0625 OLD MOUNTFIELD ROAD, B0048 MOUNTJOY ROAD, U1269 KILLYBRACK ROAD, B0048 GORTIN ROAD
25/06/2026 17:41:00 : ROADWORKS
A5, Victoria Road, Strabane, - Lane Closure, A5, Victoria Road, Strabane
Lane Closure required to facilitate work by NIE - NIE Networks - NIE Overhead Line Work.
Closure to operate: Daily 09:30 to 16:30 from Tue 28 Jul 2026 to: Tue 28 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
25/06/2026 15:49:00 : ROADWORKS
B46, Fintona Road, Dromore, - Lane Closure, B46, Fintona Road, Dromore
Lane Closure required to facilitate work by Greentown Co - Tree works for new fibre installation
Closure to operate: Daily 09:30 to 16:30 from Mon 20 Jul 2026 to: Wed 22 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
25/06/2026 13:28:00 : ROADWORKS
B45, Stiloga Road, Eglish, - Lane Closure, B45, Stiloga Road, Eglish
Lane Closure required to facilitate work by NIE - NIE Networks - NIE CIVILS AND CABLING WORKS
Closure to operate: Daily 09:30 to 16:30 from Tue 21 Jul 2026 to: Mon 27 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
25/06/2026 13:22:00 : ROADWORKS
B48, Gortin Road, Omagh, - One Way Closure, B48, Gortin Road, Omagh
One Way Lane Closure required to facilitate work by John McQuillan Contracts
Closure to operate:Continuous other from Mon 06 Jul 2026 to: Fri 28 Aug 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0048 MOUNTJOY ROAD, B0048 GORTIN ROAD, B0048 SEDAN AVENUE, B0048 MCCONNELL PLACE, B0048 ABBEY STREET, B0048 DERRY ROAD, B0048 null, B0048 STRATHROY LINK ROAD, U1528 STRATHROY ROAD.
25/06/2026 13:06:00 : ROADWORKS
A20, Newtownards Road, Newtownards, - Lane Closure, A20, Newtownards Road, Newtownards
Lane Closure required for NIE scheme.
Closure to operate: Continuous Starting 1630 on 29-06-26 and will finish at 1630 on 30-08-26.  Traffic control to operate, delays expected.
Closure to operate: Continuous Starting 1630 on 29-06-26 and will finish at 1630 on 30-08-26.  Traffic control to operate, delays expected.
25/06/2026 12:25:00 : ROADWORKS
A0002, Shore Road, Greenisland, - Lane Closure, A0002, Shore Road, Greenisland
Lane Closure required to Development amenities upgrade.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
Closure to operate:Â Daily.
Traffic control to operate, delays expected.
25/06/2026 12:23:00 : ROADWORKS BELFAST
LANE CLOSURE, B505, Beersbridge Road , Belfast
Lane Closure required for a new gas connection.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
25/06/2026 12:16:00 : ROADWORKS BELFAST
LANE CLOSURE, B23, Upper Malone Road, Belfast
Lane Closure required for repair of defective apparatus.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
25/06/2026 12:12:00 : ROADWORKS BELFAST
LANE CLOSURE, ANNADALE AVENUE AT MORNINGTON, Belfast
Lane Closure required for a new gas connection.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
25/06/2026 12:04:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, ORMEAU ROAD AT SHAFTESBURY AVENUE, Belfast
Lane Closure required for a new gas connection
Closure to operate: Off-peak - Daily from 09:30hrs until 16:30hrs. Traffic control to operate, delays expected.
Closure to operate: Off-peak - Daily from 09:30hrs until 16:30hrs. Traffic control to operate, delays expected.
25/06/2026 10:45:00 : ROADWORKS
U6402, Burren Road, Newry, - Road Closure, U6402, Burren Road, Newry
Road closure required to facilitate NIE Networks with works.
Closure to operate: From 08:00 on Monday 03 August 2026 to 18:00 on Friday 28 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â U6402 BURREN ROAD, U6402 FORTH ROAD, U6402 DALLAN ROAD, C0332CLONALLON ROAD, U6179 DONAGHAGUY ROAD.
Closure to operate: From 08:00 on Monday 03 August 2026 to 18:00 on Friday 28 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â U6402 BURREN ROAD, U6402 FORTH ROAD, U6402 DALLAN ROAD, C0332CLONALLON ROAD, U6179 DONAGHAGUY ROAD.
24/06/2026 12:31:00 : ROADWORKS
B118 Tamnaherin Rd, Eglinton. Closure, Diversionary Measures, B118, Tamnaherin Road, Eglinton
Lane Closure required to facilitate work by DfI Western (New Works & Maint Schemes) - Civils works on Tamnaherin Rd in prep of Surfacing.
Closure to operate: Daily 08:00 to 18:00 from Tue 23 Jun 2026 to: Fri 24 Jul 2026. Traffic control to operate, delays expected.
Alternative Route Via:Â Diversion 1: U1146 HIGHMOOR ROAD, B0118 TAMNAHERIN ROAD, B0118 WOODVALE ROAD.
23/06/2026 16:03:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Ormeau Road, Belfast
Delete bold as appropriate & fill in information in italics:
Road closure/Lane Closure required to [ENTER CLOSURE REASON].
Closure to operate: [ENTER CLOSURE OPERATION PERIOD] Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â [ENTER ALTERNATE ROUTE]
Road closure/Lane Closure required to [ENTER CLOSURE REASON].
Closure to operate: [ENTER CLOSURE OPERATION PERIOD] Diversion/Traffic control to operate, delays expected.
Alternative Route Via:Â [ENTER ALTERNATE ROUTE]
23/06/2026 10:13:00 : ROADWORKS
U9001, BLAIR MAYNE ROAD SOUTH, Newtownards, - Lane Closure, U9001, BLAIR MAYNE ROAD SOUTH, Newtownards
Lane Closure required for Streetlighting upgrade scheme.
Closure to operate: Daily 09:30 to 16:30 from Thu 02 Jul to Fri 31 Jul  Traffic control to operate, delays expected.
Closure to operate: Daily 09:30 to 16:30 from Thu 02 Jul to Fri 31 Jul  Traffic control to operate, delays expected.
22/06/2026 16:16:00 : ROADWORKS BELFAST
A2, Belfast Road, Bangor, - Lane Closure, A2, Belfast Road, Bangor
Lane Closure required for Defective apparatus.
Closure to operate: Daily 08:00am - 12:00pm on Sun 26 Jul Traffic control to operate, delays expected.
Closure to operate: Daily 08:00am - 12:00pm on Sun 26 Jul Traffic control to operate, delays expected.
22/06/2026 15:32:00 : ROADWORKS
C0252, Gransha Road, Bangor, - Road Closure, C0252, Gransha Road, Bangor
Road closure required For Resurfacing.
Closure to operate: Continuous starting 8am on Tue 28 Jul and finishing Fri 31 Jul Diversion to operate, delays expected.
Alternative Route Via:Â C0252 GRANSHA ROAD, A0048 GRANSHA ROAD SOUTH, C0368 GREEN ROAD, A0021 NEWTOWNARDS ROAD, U0134 BALLOO ROAD
Closure to operate: Continuous starting 8am on Tue 28 Jul and finishing Fri 31 Jul Diversion to operate, delays expected.
Alternative Route Via:Â C0252 GRANSHA ROAD, A0048 GRANSHA ROAD SOUTH, C0368 GREEN ROAD, A0021 NEWTOWNARDS ROAD, U0134 BALLOO ROAD
22/06/2026 13:08:00 : ROADWORKS
B34, Killyman Road, Dungannon, - Lane Closure, B34, Killyman Road, Dungannon
Lane Closure required to facilitate work by NIE - NIE Networks - NIE UG cabling works.
Closure to operate: Continuous other from Fri 19 Jun 2026 to: Fri 17 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
22/06/2026 10:31:00 : ROADWORKS
B27, Kilkeel Road, Newry, - Lane Closure, B27, Kilkeel Road, Newry
Lane Closure required to facilitate DFI Southern with works.
Closure to operate: From 08:00 on Thursday 25 June 2026 to 18:00 on Friday 31 July 2026. Traffic control to operate, delays expected.
Closure to operate: From 08:00 on Thursday 25 June 2026 to 18:00 on Friday 31 July 2026. Traffic control to operate, delays expected.
19/06/2026 12:01:00 : ROADWORKS
ROAD CLOSED - DIVERSION IN PLACE, B101, Pond Park Road , Lisburn
Road closure required for sewer refurbishment.
Closure to operate:Â Continuously.
Diversion to operate, delays expected.
Alternative Route Via:Â
A501 SHEEPWALK ROAD, A30 GLENAVY ROAD, A30 BALLYMACASH ROAD.
Closure to operate:Â Continuously.
Diversion to operate, delays expected.
Alternative Route Via:Â
A501 SHEEPWALK ROAD, A30 GLENAVY ROAD, A30 BALLYMACASH ROAD.
19/06/2026 10:04:00 : ROADWORKS
B7, Chapel Hill, Newry, - Lane Closure, B7, Chapel Hill, Newry
Lane Closure required to facilitate DFI Southern with works.
Closure to operate: From 08:00 on Sunday 26 July 2026 to 18:00 on Friday 21 August 2026. Traffic control to operate, delays expected.
Closure to operate: From 08:00 on Sunday 26 July 2026 to 18:00 on Friday 21 August 2026. Traffic control to operate, delays expected.
19/06/2026 09:40:00 : ROADWORKS BELFAST
ROAD CLOSED DIVERSION IN PLACE, A2, Middlepath Street, Belfast
Road closure required for DBFO1 major maintenance - M3 bridge bearings.
Closure to operate:Â Continuously.
Diversion to operate, delays expected.
Alternative Route Via:Â A2 Middlepath Street - A2 Bridge End - Ann Street - Victoria Street - Dunbar Link - Great Patrick Street - York Street.
Closure to operate:Â Continuously.
Diversion to operate, delays expected.
Alternative Route Via:Â A2 Middlepath Street - A2 Bridge End - Ann Street - Victoria Street - Dunbar Link - Great Patrick Street - York Street.
19/06/2026 09:37:00 : ROADWORKS BELFAST
ROAD CLOSED - DIVERSION IN PLACE, A2, Middlepath Street, Belfast
Road closure required for DBFO1 major maintenance - M3 bridge bearings.
Closure to operate: Continuously.  Diversion to operate, delays expected.
Alternative Route Via:Â A2 Middlepath Street - A2 Bridge End - Ann Street - Victoria Street - Dunbar Link - Great Patrick Street - York Street.
Closure to operate: Continuously.  Diversion to operate, delays expected.
Alternative Route Via:Â A2 Middlepath Street - A2 Bridge End - Ann Street - Victoria Street - Dunbar Link - Great Patrick Street - York Street.
19/06/2026 08:35:00 : ROADWORKS
LANE CLOSURE, B101, Pond Park Road, Lisburn
Lane Closure required for repair of defective apparatus.
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
Closure to operate:Â Off-peak.
Traffic control to operate, delays expected.
18/06/2026 17:38:00 : ROADWORKS
B46, Galbally Road, Trillick, - Lane Closure, B46, Galbally Road, Trillick
Lane Closure required to facilitate work by Fibrus - Testing Rodding and Roping with Civils on the Fibrus Network
Closure to operate:Daily 09:30 to 16:30 from Thu 16 Jul 2026 to: Fri 17 Jul 2026.  Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
18/06/2026 17:14:00 : ROADWORKS
B46, Dromore Road, Omagh, - Lane Closure, B46, Dromore Road, Omagh
Lane Closure required to to facilitate work by Fibrus - Civils on the Fibrus Network
Closure to operate: Daily 09:30 to 16:30 from Thu 16 Jul 2026 to: Fri 17 Jul 2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes
18/06/2026 13:50:00 : ROADWORKS
A0042, Galgorm Road, Ballymena, - Lane Closure, A0042, Galgorm Road, Ballymena
Lane Closure required for ducting route in footpath.
Closure to operate:Â DailyÂ
Closure to operate:Â DailyÂ
18/06/2026 11:10:00 : ROADWORKS
A514, Crescent link, Londonderry, - Road Closure, A514, Crescent link, Londonderry
There will be a Road closure from Caw Roundabout to Sperrin Park.
This will be operational Continuous other from Mon 29 Jun 2026 to: Thu 31 Dec 2026.
The closure is to facilitate work by NI Water Capital
Reason for closure: Crescent Link Southbound Footpath Closure between Caw Roundabout andtemporary footpath to Rosses Gate for a distance of 210 metres
The anticipated delay will be Less than 5 minutes
An alternative route will be signed with traffic being diverted via:Diversion 1: A1002 CLOONEY ROAD, A0514 CRESCENT LINK
Notes:This is Footpath closure only.From 08:00 on the 29th June to 17:00 on the 31st December
This will be operational Continuous other from Mon 29 Jun 2026 to: Thu 31 Dec 2026.
The closure is to facilitate work by NI Water Capital
Reason for closure: Crescent Link Southbound Footpath Closure between Caw Roundabout andtemporary footpath to Rosses Gate for a distance of 210 metres
The anticipated delay will be Less than 5 minutes
An alternative route will be signed with traffic being diverted via:Diversion 1: A1002 CLOONEY ROAD, A0514 CRESCENT LINK
Notes:This is Footpath closure only.From 08:00 on the 29th June to 17:00 on the 31st December
18/06/2026 11:03:00 : ROADWORKS
A0027, Mahon Road, Craigavon, - Lane Closure, A0027, Mahon Road, Craigavon
Lane closure from 100m north of jnc Mahon Road & Mahon Court to 100m south of jnc Mahon Road & Mahon Court.
This will be operational daily 08:00 to 18:00 from Sat 25 Jul 2026 to Sun 26 Jul 2026.
The closure is to facilitate work by NIE - NIE Networks
The anticipated delay will be less than 5 minutes
This will be operational daily 08:00 to 18:00 from Sat 25 Jul 2026 to Sun 26 Jul 2026.
The closure is to facilitate work by NIE - NIE Networks
The anticipated delay will be less than 5 minutes
17/06/2026 17:43:00 : ROADWORKS
M2 Motorway Southbound, - Lane Closure, M2 Motorway Southbound
Lane Closure required for DBFO1 major maintenance.
Closure to operate:Â Overnight OnlyÂ
Closure to operate:Â Overnight OnlyÂ
17/06/2026 12:32:00 : ROADWORKS
C0635, Main Street, Augher, - Road Closure, C0635, Main Street, Augher
Road closure  required to facilitate work by Clogher Valley Agricultural SocietyReason for closure: Clogher Valley Show
Closure to operate: Daily 08:00 to 18:00 from Wed 29 Jul 2026 to: Wed 29 Jul 2026. Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: A0004 CROSSOWEN ROAD, A0028 CROSSOWEN ROAD, B0083 BALLYMAGOWAN ROAD
16/06/2026 15:39:00 : ROADWORKS
A6, Foreglen Road, Dungiven, East Bound - Road Closure, A6, Foreglen Road East Bound, Dungiven
Road Closure required for NIE overhead line work.
Closure to operate: Overnight Only Diversion to operate, delays expected.
Alternative Route Via:Â Baranailt Road - Foreglen Road - Feeny Road
Closure to operate: Overnight Only Diversion to operate, delays expected.
Alternative Route Via:Â Baranailt Road - Foreglen Road - Feeny Road
16/06/2026 15:21:00 : ROADWORKS
A27, Marlborough Retail Park, Craigavon, - Lane Closure, A27, Marlborough Retail Park, Craigavon
Lane closure from Highfield Roundabout to Eastway.
This will be operational overnight Sunday 5th July 04:00 to 11:30 & Sunday 19th July 04:00 to 11:30
The closure is to facilitate work by BT Openreach
The anticipated delay will be less than five minutes
This will be operational overnight Sunday 5th July 04:00 to 11:30 & Sunday 19th July 04:00 to 11:30
The closure is to facilitate work by BT Openreach
The anticipated delay will be less than five minutes
16/06/2026 13:07:00 : ROADWORKS
B34, Killyman Road, Dungannon, - Lane Closure, B34, Killyman Road, Dungannon
There will be a Lane closure from Gortmerron Link Road to M1 under bridge.
This will be operational Continuous other from Mon 15 Jun 2026 to: Fri 17 Jul 2026.
The closure is to facilitate work by NIE - NIE Networks
Reason for closure: NIE UG cabling works.
The anticipated delay will be Less than 5 minutes
This will be operational Continuous other from Mon 15 Jun 2026 to: Fri 17 Jul 2026.
The closure is to facilitate work by NIE - NIE Networks
Reason for closure: NIE UG cabling works.
The anticipated delay will be Less than 5 minutes
15/06/2026 14:56:00 : ROADWORKS
U8027, SILVERBIRCH ROAD, Bangor, - Lane Closure, U8027, SILVERBIRCH ROAD, Bangor
Lane Closure required for NIE Works.
Closure to operate: Continuous for 4 weeks starting 01-07-26 to 26-07-26 Traffic control to operate, delays expected.
Closure to operate: Continuous for 4 weeks starting 01-07-26 to 26-07-26 Traffic control to operate, delays expected.
12/06/2026 11:00:00 : ROADWORKS
U8026, Hazeldene Avenue, Bangor, - Road Closure, U8026, Hazeldene Avenue, Bangor
Road closure required for NI Water - Lead Pipe Replacement.
Closure to operate: Continuous from Mon 29 Jun to Fri 17 Jul Diversion to operate, delays expected.
Alternative Route Via: U8024 BROADWAY, U8026 HAZELDENE GARDENS, U8026 HAZELDENE DRIVE
Closure to operate: Continuous from Mon 29 Jun to Fri 17 Jul Diversion to operate, delays expected.
Alternative Route Via: U8024 BROADWAY, U8026 HAZELDENE GARDENS, U8026 HAZELDENE DRIVE
12/06/2026 10:31:00 : ROADWORKS BELFAST
LANE CLOSURE, A7, Belfast Road, Carryduff
Lane Closure required for NIE works - excavate approximately 160 metres of trench from TX Pole 655 to meet customer track at the entrance to Millennium Primary school.
Closure to operate: Off-peak. Two way traffic lights in operation. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Two way traffic lights in operation. Traffic control to operate, delays expected.
12/06/2026 08:42:00 : ROADWORKS BELFAST
LANE CLOSURE, A20, UPPER NEWTOWNARDS ROAD, Belfast
/Lane Closure required for telecom works.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
12/06/2026 08:36:00 : ROADWORKS BELFAST
LANE CLOSURE, A24, Annadale Avenue, Belfast
Lane Closure required for gas connection closing the left hand lane for the duration.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
Closure to operate: Off-peak. Traffic control to operate, delays expected.
11/06/2026 16:28:00 : ROADWORKS
U1037, KILLYMEAL ROAD, DUNGANNON, Dungannon, - Road Closure, U1037, KILLYMEAL ROAD, DUNGANNON, Dungannon
Road closure required to facilitate work by Mills ContractsReason for closure: New Edendork Primary School Scheme
Closure to operate:Â Mon 06 Jul 2026 to: Fri 16 Oct 2026
Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0034 KILLYMAN ROAD, C0638 BUSH ROAD, B0106 BUSH ROAD, A0045 COALISLAND ROAD
11/06/2026 13:21:00 : ROADWORKS
A45 Coalisland Road, Derrywinnen, Coalisland, Lane Closure, A45, Coalisland Road, Coalisland
Lane Closure required to facilitate work by Mills Contracts - Creating a right turn pocket for Edendork Primary School scheme.
Closure to operate: Continuous other from Mon 06 Jul 2026 to: Fri 16 Oct 2026. Traffic control to operate, delays expected.
Notes:Continuously from 08:00 on 06.07.26 to 16:00 on 16.10.26The permit is approved on the strict condition that the TM Company MUST provide remote manually controlled traffic management (stop/go) to help manage queuing – operator controlling the traffic management should be located away from the line of traffic.Traffic Management Meeting 28th May 2026 DfI and Contractor agreement ~ Traffic managementarrangements - Road closure with diversion for Killymeal Road / Coalisland Road- 3 person team to operate traffic management from 8am to 6pm then continuous traffic lights outside of these hours - if not managed in accordance with the conditions, the TTR permit may be revoked.Early consultation to be undertaken by (Woodvale) to inform local residents, schools, Council Officials and Elected Representatives.
11/06/2026 11:27:00 : ROADWORKS
B0073, MOLESWORTH ROAD, COOKSTOWN, - Lane Closure, B0073, MOLESWORTH ROAD, COOKSTOWN, Cookstown
Lane Closure required to facilitate work by AG Wilson Civil EngineeringReason for closure: NI Water sewer installation
Closure to operate: Mon 03 Aug 2026 to: Fri 28 Aug 2026 Traffic control to operate, delays expected.
10/06/2026 12:27:00 : ROADWORKS
C0251, CRAWFORDSBURN ROAD, Newtownards, - Lane Closure, C0251, CRAWFORDSBURN ROAD, Newtownards
Lane Closure required for Defective apparatus.
Closure to operate: Daily 09:30-16:00 on Fri 31 Jul Traffic control to operate, delays expected.
Closure to operate: Daily 09:30-16:00 on Fri 31 Jul Traffic control to operate, delays expected.
04/06/2026 15:23:00 : ROADWORKS
B0043, Pomeroy Road, Dungannon, - Road Closure, B0043, Pomeroy Road, Dungannon
Road closure required to facilitate work by DfI Western (New Works & Maint Schemes)Reason for closure: To facilitate surface dressing
Closure to operate: Sat 06 Jun 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected. The anticipated delay will be 5 - 15 minutes
Alternative Route Via:Â Diversion 1: B0160 TANDERAGEE ROAD, B0043 POMEROY ROAD, B0043 MAIN STREET, B0043 MULLAGHMORE ROAD, C0636 TULLYCULLION ROAD, A0029 COOKSTOWN ROAD, B0160 ANNAGHQUIN ROAD
04/06/2026 15:16:00 : ROADWORKS
B4, Tullyreavy Road, Pomeroy, - Road Closure, B4, Tullyreavy Road, Pomeroy
Road closure required to To facilitate surface dressing.
Closure to operate: Daily other (See notes) from Sat 06 Jun 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: B0004 EDENDOIT ROAD, B0043 TANDERAGEE ROAD, B0160 TANDERAGEE ROAD, B0160 ANNAGHQUIN ROAD, B0004 POMEROY ROAD, B0162 POMEROY ROAD, A0505 DRUM ROAD, A0505 Drum Road, C0622 SWEEP ROAD, C0622 SANDHOLES ROAD, U0831 STRIFEHILL ROAD, A0029 DUNGANNON.
Notes:07:00 - 22:00
04/06/2026 09:19:00 : ROADWORKS
B0196, Clonmakate Road, Craigavon, - Lane Closure, B0196, Clonmakate Road, Craigavon
Lane closure from 20m North of no.14 Clonmakate Road to 20m North of no.14 Clonmakate Road.
This will be operational continuously from 09:30 Mon 20 Jul 2026 to 16:30 Fri 07 Aug 2026.
The closure is to facilitate work by NI Water Capital
The anticipated delay will be less than 5 minutes
This will be operational continuously from 09:30 Mon 20 Jul 2026 to 16:30 Fri 07 Aug 2026.
The closure is to facilitate work by NI Water Capital
The anticipated delay will be less than 5 minutes
02/06/2026 10:46:00 : ROADWORKS
C0251, Crawfordsburn Road, Newtownards, - Lane Closure, C0251, Crawfordsburn Road, Newtownards
Lane Closure required for Defective apparatus.
Closure to operate:Â Daily 08:00 to 18:00 on Sun 26 Jul
Traffic control to operate, delays expected.
Closure to operate:Â Daily 08:00 to 18:00 on Sun 26 Jul
Traffic control to operate, delays expected.
27/05/2026 13:27:00 : ROADWORKS
B0007, Drumlough Road, Newry, - Road Closure, B0007, Drumlough Road, Newry
Road closure from Junction with John Street to Junction with Drumlough School Road.
This will be operational continuously from 08:00 Mon 15 Jun 2026 to 18:00 Fri 18 Sep 2026.
The closure is to facilitate work by NI Water Capital
The anticipated delay will be less than 5 minutes
An alternative route will be signed with traffic being diverted via: Diversion 1: B0007 IVEAGH BUNGALOWS, A0025 NEWRY ROAD, B0007 DRUMLOUGH ROAD, B0007 BAVAN ROAD, C0335 CULLION ROAD, U6069 OLD NEWRY ROAD
This will be operational continuously from 08:00 Mon 15 Jun 2026 to 18:00 Fri 18 Sep 2026.
The closure is to facilitate work by NI Water Capital
The anticipated delay will be less than 5 minutes
An alternative route will be signed with traffic being diverted via: Diversion 1: B0007 IVEAGH BUNGALOWS, A0025 NEWRY ROAD, B0007 DRUMLOUGH ROAD, B0007 BAVAN ROAD, C0335 CULLION ROAD, U6069 OLD NEWRY ROAD
21/05/2026 17:27:00 : ROADWORKS
A0043, Glenravel Road, Ballymena, - Lane Closure, A0043, Glenravel Road, Ballymena
Lane Closure required for construction of road widening works for the new Lady Queen of Peace School. Alternating lane works undertaken by manned traffic control.
Closure to operate: Continuously Traffic control to operate, delays expected.
Closure to operate: Continuously Traffic control to operate, delays expected.
21/05/2026 15:30:00 : ROADWORKS
A2, Ballywalter Road, Newtownards, - Road Closure, A2, Ballywalter Road, Newtownards
Road closure required for Carriageway Resurfacing Works.
Closure to operate: Daily 08:00 to 18:00 from Mon 27 Jul to Fri 04 Sep Diversion to operate, delays expected.
Alternative Route Via:Â A0002 BALLYWALTER ROAD, A0002 WHITECHURCH ROAD, C0256 DUNOVER ROAD, C0256 CARDY ROAD EAST, C0256 CARDY ROAD, C0255 MANSE ROAD, C0252 BALLYBLACK ROAD EAST, B0172 BALLYBLACK ROAD EAST, C0253 KILLAUGHEY ROAD, A0002 MILLISLE ROAD, A0002 DONAGHADEE ROAD, A0002 MAIN STREET
Closure to operate: Daily 08:00 to 18:00 from Mon 27 Jul to Fri 04 Sep Diversion to operate, delays expected.
Alternative Route Via:Â A0002 BALLYWALTER ROAD, A0002 WHITECHURCH ROAD, C0256 DUNOVER ROAD, C0256 CARDY ROAD EAST, C0256 CARDY ROAD, C0255 MANSE ROAD, C0252 BALLYBLACK ROAD EAST, B0172 BALLYBLACK ROAD EAST, C0253 KILLAUGHEY ROAD, A0002 MILLISLE ROAD, A0002 DONAGHADEE ROAD, A0002 MAIN STREET
21/05/2026 12:04:00 : ROADWORKS
U1556, Pump Street, Londonderry, - Road Closure, U1556, Pump Street, Londonderry
Road closure required to facilitate work by Aaron Kelly, Hollandale Projects Ltd - The road is partially closed due to container structures installed to support an unstable building and ensure public safety while permanent stabilisation.
Closure to operate: Continuous other from Thu 14 May 2026 to: Tue 17 Nov 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0578 FERRYQUAY STREET, C0578 THE DIAMOND, C0578 BISHOP STREET WITHIN, U1556 LONDON STREET, U1556 HAWKIN STREET, U1556 HORACE STREET, C0578 CARLISLE ROAD.
Notes:Property Owner/Contractor to consult and update businesses along Pump Street.
20/05/2026 17:20:00 : ROADWORKS
B72, Railway Street, Strabane, - Lane Closure, B72, Railway Street, Strabane
Lane Closure required to facilitate work by FP McCann - Strabane Public Realm Works.
Closure to operate: Continuous other from Mon 25 May 2026 to: Sat 05 Sep 2026. Traffic control to operate, delays expected.
The anticipated delay will be 5 - 15 minutes.
15/05/2026 12:12:00 : ROADWORKS
U1062, Niblock Road, Antrim, - Road Closure, U1062, Niblock Road, Antrim
Road Closure required for carriageway widening to facilitate new development.
Closure to operate: Continuously Diversion to operate, delays expected.
Alternative Route Via:Â U1063 NIBLOCK RD S1, U1063 SPRINGFARM ROAD, B0518 STILES WAY, A0026BALLYMENA ROAD, U1197 MEADOW LANDS, U1197 NIBLOCK ROAD
Closure to operate: Continuously Diversion to operate, delays expected.
Alternative Route Via:Â U1063 NIBLOCK RD S1, U1063 SPRINGFARM ROAD, B0518 STILES WAY, A0026BALLYMENA ROAD, U1197 MEADOW LANDS, U1197 NIBLOCK ROAD
13/05/2026 13:28:00 : ROADWORKS
B0077, West Street, Craigavon, - Lane Closure, B0077, West Street, Craigavon
Lane closure from Junction with Charles Street to 250m E of junction with West Street.
This will be operational continuously from 9am Mon 17 Aug 2026 to 4pm Fri 09 Oct 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: NI Water sewer installation
The anticipated delay will be less than 5 minutes
This will be operational continuously from 9am Mon 17 Aug 2026 to 4pm Fri 09 Oct 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: NI Water sewer installation
The anticipated delay will be less than 5 minutes
13/05/2026 13:25:00 : ROADWORKS
U1407, Charles Street, Craigavon, - Lane Closure, U1407, Charles Street, Craigavon
Lane closure from 20m N of Junction with Deer Park to Junction with West Street.
This will be operational continuous from 9am Wed 01 Jul 2026 to 4pm Fri 28 Aug 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: Sewer installation for NI Water
The anticipated delay will be less than 5 minutes
This will be operational continuous from 9am Wed 01 Jul 2026 to 4pm Fri 28 Aug 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: Sewer installation for NI Water
The anticipated delay will be less than 5 minutes
13/05/2026 13:22:00 : ROADWORKS
U1353, Woodlands Manor, Craigavon, - Lane Closure, U1353, Woodlands Manor, Craigavon
Lane closure from 37 Woodlands Manor to Junction with Charles Street.
This will be operational continuously from 9am Mon 15 Jun 2026 to 4pm Fri 31 Jul 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: Sewer Installation for NI Water
The anticipated delay will be less than 5 minutes
This will be operational continuously from 9am Mon 15 Jun 2026 to 4pm Fri 31 Jul 2026.
The closure is to facilitate work by AG Wilson Civil Engineering
Reason for closure: Sewer Installation for NI Water
The anticipated delay will be less than 5 minutes
12/05/2026 14:39:00 : ROADWORKS
B0133, Maytown Road, Bessbrook, - Road Closure, B0133, Maytown Road, Bessbrook
Road closure required to facilitate DFI Southern with works.
Closure to operate: From 08:00 on Monday 01 June 2026 to 18:00 on Friday 21 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â C0214 KINGSMILL ROAD, U5104 TULLYWINNEY ROAD, B0134 TULLYAH ROAD, A0025 NEWRY ROAD, A0025 NEWTOWN ROAD, A0025 OLD ROAD, A0025 MAIN STREET, A0025 CAMLOUGH ROAD, B0133 MILLVALE ROAD, B0133 MAYTOWN ROAD
Closure to operate: From 08:00 on Monday 01 June 2026 to 18:00 on Friday 21 August 2026. Diversion in place, delays expected.
Alternative Route Via:Â C0214 KINGSMILL ROAD, U5104 TULLYWINNEY ROAD, B0134 TULLYAH ROAD, A0025 NEWRY ROAD, A0025 NEWTOWN ROAD, A0025 OLD ROAD, A0025 MAIN STREET, A0025 CAMLOUGH ROAD, B0133 MILLVALE ROAD, B0133 MAYTOWN ROAD
11/05/2026 12:11:00 : ROADWORKS
A4, Dual Carriageway, Dungannon, Lane Closure (West Bound), A4, Dual Carriageway, Dungannon
Lane Closure required to facilitate work by Amey Transport Infrastructure - Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying.
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
The anticipated delay will be Less than 5 minutes.
08/05/2026 16:45:00 : ROADWORKS
F4667, River Mourne Footpath, Sion Mills, - Footpath , F4667, River Mourne Footpath, Sion Mills
Footpath Closure required  Bridge Inspection and Maintenance work.
Closure to operate: Continuously for 6 Months. Diversion to operate, delays expected.
Alternative Route Via:Â Mill Av- Liskey Rd-Fyfin Rd-Melmount Rd-Mulvin Rd-Melmount Rd-Mill Av and vice versa.
08/05/2026 11:42:00 : ROADWORKS
U9012, Belvedere Road, Newtownards, - Road Closure, U9012, Belvedere Road, Newtownards
Road closure required for Footway and Carriageway Resurfacing Works.
Closure to operate:Â Daily 08:00 to 18:00 from Mon 01 Jun to Fri 31 Jul
 Diversion to operate, delays expected.
Alternative Route Via:Â A0021 BANGOR ROAD, U9012 LONDONDERRY ROAD
Closure to operate:Â Daily 08:00 to 18:00 from Mon 01 Jun to Fri 31 Jul
 Diversion to operate, delays expected.
Alternative Route Via:Â A0021 BANGOR ROAD, U9012 LONDONDERRY ROAD
06/05/2026 18:43:00 : ROADWORKS
U8082, Levally Road, Enniskillen, - Road Closure, U8082, Levally Road, Enniskillen
Road closure required to facilitate work by NI Water Capital - Installation of new watermains
Closure to operate: Continuous other from Mon 18 May 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: C0443 DAIRIES ROAD, U8462 DRUMCOSE ROAD, C0650 DRUMCOSE ROAD, A0046 LOUGH SHORE ROAD, U8494 DRUMBOORY ROAD, U8082 LEVALLY ROAD.
Notes:Project consists of a new watermain installation on Levally Road and Ballygonnell Road- dates onboth permits will overlap but works will only be on one road at a time.Local access to be maintained.
06/05/2026 18:23:00 : ROADWORKS
U8501, Ballygonnell Road, Enniskillen, - Road Closure, U8501, Ballygonnell Road, Enniskillen
Road closure required to facilitate work by NI Water Capital - Installation of new watermains on behalf of NI Water.
Closure to operate: Continuous other from Mon 18 May 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U8501 BALLYGONNELL ROAD, B0081 DERRYGONNELLY ROAD, U8494 DRUMBOORY ROAD, U1140 DRUMBOORY ROAD, U0410 DRUMBOORY ROAD, U0421 DRUMBOORY ROAD, U8082 LEVALLY ROAD.
Notes:Project consists of a new watermain installation on Levally Road and Ballygonnell Road- dates onboth permits will overlap but works will only be on one road at a time. Local access to be maintained
Closure to operate: Continuous other from Mon 18 May 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: U8501 BALLYGONNELL ROAD, B0081 DERRYGONNELLY ROAD, U8494 DRUMBOORY ROAD, U1140 DRUMBOORY ROAD, U0410 DRUMBOORY ROAD, U0421 DRUMBOORY ROAD, U8082 LEVALLY ROAD.
Notes:Project consists of a new watermain installation on Levally Road and Ballygonnell Road- dates onboth permits will overlap but works will only be on one road at a time. Local access to be maintained
05/05/2026 16:28:00 : ROADWORKS
B0507, ABERCORN ROAD, LONDONDERRY, - Lane Closure, B0507, ABERCORN ROAD, LONDONDERRY, Londonderry
Lane Closure required to facilitate work by Hugh J O'BoyleReason for closure: concrete pour and pumping setup
Closure to operate: Daily 08:00 to 18:00 from Wed 20 May 2026 to: Sat 31 Oct 2026 Traffic control to operate, delays expected. The anticipated delay will be 5 - 15 minutes
21/04/2026 14:57:00 : ROADWORKS
B0034, Killyman Road, Dungannon, - Lane Closure, B0034, Killyman Road, Dungannon
Lane Closure required to facilitate work by NIE - NIE NetworksReason for closure: NIE UG cabling works
Closure to operate: Mon 27 Apr 2026 to: Fri 17 Jul 2026 Traffic control to operate, delays expected.
21/04/2026 11:03:00 : ROADWORKS
M1 MOTORWAY (WEST BOUND, Dungannon, - Lane Closure, M1, M1 MOTORWAY (WEST BOUND, Dungannon
Lane Closure required to facilitate work by Amey Transport InfrastructureReason for closure: Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
21/04/2026 10:59:00 : ROADWORKS
M0001, M1 MOTORWAY (EAST BOUND, Dungannon, - Lane Closure, M0001, M1 MOTORWAY (EAST BOUND, Dungannon
Lane Closure required to facilitate work by Amey Transport InfrastructureReason for closure: Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
21/04/2026 10:53:00 : ROADWORKS
A4 DUAL CARRIAGEWAY (WEST BOUND, - 15 min Obstruction, A4, A4 DUAL CARRIAGEWAY (WEST BOUND, Dungannon
Lane Closure required to facilitate work by Amey Transport InfrastructureReason for closure: Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
21/04/2026 10:49:00 : ROADWORKS
A4 DUAL CARRIAGEWAY (EAST BOUND) - 15 min Obstruction, A4 , A4 DUAL CARRIAGEWAY (EAST BOUND), Dungannon
Lane Closure required to facilitate work by Amey Transport InfrastructureReason for closure: Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
Alter
21/04/2026 10:43:00 : ROADWORKS
A0004, A4 DUAL CARRIAGEWAY (EAST BOUND), - Lane Closure, A0004, A4 DUAL CARRIAGEWAY (EAST BOUND), BALLYGAWLEY, Dungannon
Lane Closure required to facilitate work by Amey Transport InfrastructureReason for closure: Routine Maintenance: Grass cutting, Sweeping, Gully Cleaning & Weed Spraying
Closure to operate: Overnight each night 23:00 to 06:00 from Mon 11 May 2026 to: Mon 03 Aug2026. Traffic control to operate, delays expected.
02/04/2026 10:55:00 : ROADWORKS
U1386, Legahory Court, Craigavon, - Footway Closure, U1386, Legahory Court, Craigavon
Footway closure outside Brownlow Health Centre.
This will be operational continuously from Thu 02 Apr 2026 to Mon 30 Nov 2026.
The closure is to facilitate work by CivCo Ltd
Reason for closure: To facilitate construction of a new two story extension at Brownlow Health Centre
The anticipated delay will be less than five minutes
This will be operational continuously from Thu 02 Apr 2026 to Mon 30 Nov 2026.
The closure is to facilitate work by CivCo Ltd
Reason for closure: To facilitate construction of a new two story extension at Brownlow Health Centre
The anticipated delay will be less than five minutes
01/04/2026 11:21:00 : ROADWORKS
A2, Madam's Bank Road, Londonderry, - Lane Closure., A2, Madam's Bank Road, Londonderry
Lane Closure required to facilitate work by NI Water Capital - NI Water - Directional drilling - Lenamore WWPS.
Closure to operate: Continuous other from Mon 27 Jul 2026 to: Wed 19 Aug 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CULMORE ROAD, A0515 MADAM'S BANK ROAD.
Closure to operate: Continuous other from Mon 27 Jul 2026 to: Wed 19 Aug 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CULMORE ROAD, A0515 MADAM'S BANK ROAD.
01/04/2026 10:35:00 : ROADWORKS
A2, Culmore Road, Londonderry, A2, Culmore Road, Londonderry
Lane Closure required to facilitate work by NI Water Capital - Directional drilling
Closure to operate: Mon 27 Jul 2026 to: Wed 19 Aug 2026 Diversion to operate, delays expected.Notes:From 08:00 on the 27th of July to 17:00 on the 19th August
Alternative Route Via:Â Diversion 1: A1002 CULMORE ROAD, A0515 MADAM'S BANK ROAD
30/03/2026 15:23:00 : ROADWORKS
U4469, Meeting House Road, Banbridge, - Road Closure, U4469, Meeting House Road, Banbridge
Road closure from Linnenhall Street to Scarva Street.
This will be operational continuously from Mon 30 Mar 2026 to Thu 30 Sep 2027.
The closure is to facilitate work by Arbour Housing
Reason for closure: To facilitate construction of social housing.
The anticipated delay will be less than five minutes.
An alternative route will be signed with traffic being diverted via: Diversion 1: C0351 Linenhall Street, U4469 Commercial Road, B0010 Scarva Street.
This will be operational continuously from Mon 30 Mar 2026 to Thu 30 Sep 2027.
The closure is to facilitate work by Arbour Housing
Reason for closure: To facilitate construction of social housing.
The anticipated delay will be less than five minutes.
An alternative route will be signed with traffic being diverted via: Diversion 1: C0351 Linenhall Street, U4469 Commercial Road, B0010 Scarva Street.
03/02/2026 11:47:00 : ROADWORKS
B0507, Abercorn Road, Londonderry, - 15 min Obstruction, B0507, Abercorn Road, Londonderry
Lane Closure required to facilitate work by Hugh J O' Boyle
Closure to operate: Mon 09 Feb 2026 to: Tue 31 Aug 2027. Traffic control to operate, delays expected. The anticipated delay will be 5 - 15 minutes
30/01/2026 14:21:00 : ROADWORKS
A2, Bridge Street, Londonderry, - One Way Closure, A2, Bridge Street, Londonderry
One Way Closure required to facilitate work by NI trunk main on side of upstream side of Craigavon Bridge Water Capital - Slip Lane Closure to enable access for materials and equipment to replace NIW.
Closure to operate: Continuous other from Mon 16 Feb 2026 to: Fri 31 Jul 2026. Diversion to operate, delays expected.
Alternative Route Via:Â Diversion 1: A1002 CRAIGAVON BRIDGE LOWER, A1002 DUKE STREET, A1002 VICTORIA ROAD LINK, A0005 VICTORIA ROAD.
Notes:Access maintained for emergency services.
28/01/2026 10:31:00 : ROADWORKS
U0337, Lisnawery Road, Augher, - Road Closure, U0337, Lisnawery Road, Augher
Road closure due to Flooding Diversion to operate, Delays expected.
Section Office Location Mid Ulster South Date 27.01.26 Time 15:00 Prepared by Lesley Maxwell Contact details 07717732658
28/01/2026 10:20:00 : ROADWORKS
B83, Ballymagowan Road, Clogher, - Road Closure, B83, Ballymagowan Road, Clogher
Road closure due to Flooding Diversion in Place
Section Office Location Mid Ulster South Date 27.01.26 Time 15:00
Prepared by Lesley Maxwell Contact details 07717732658
04/11/2025 13:52:00 : ROADWORKS
A0040, Foyle Road, Londonderry, - Lane Closure, A0040, Foyle Road, Londonderry
Lane Closure required to facilitate work by Hj o Boyle
Closure to operate: Daily 09:30 to 16:30 from Mon 10 Nov 2025 to: Tue 10 Aug 2027 Traffic control to operate, delays expected.
24/10/2025 16:09:00 : ROADWORKS
U0132, Seafront Road, Holywood, - Road Closure, U0132, Seafront Road, Holywood
Road closure required for G14 World Championships.
Closure to operate: Continuous from 5pm on Thursday 13th August 2026 to 9am on Saturday 15th August  Diversion to operate, delays expected.
Alternative Route Via:Â U0132 AILSA ROAD, U0132 CIRCULAR ROAD WEST
Closure to operate: Continuous from 5pm on Thursday 13th August 2026 to 9am on Saturday 15th August  Diversion to operate, delays expected.
Alternative Route Via:Â U0132 AILSA ROAD, U0132 CIRCULAR ROAD WEST
23/10/2025 16:12:00 : ROADWORKS
U0132, SEAFRONT ROAD, Holywood, - Road Closure, U0132, SEAFRONT ROAD, Holywood
Road closure required for GP14 World Championships.
Closure to operate: Continuous from Thursday 6th August 2026 to Thursday 13th Aug 2026 Diversion to operate, delays expected.
Alternative Route Via:Â U0132 CIRCULAR ROAD WEST, U0132 AILSA ROAD
Closure to operate: Continuous from Thursday 6th August 2026 to Thursday 13th Aug 2026 Diversion to operate, delays expected.
Alternative Route Via:Â U0132 CIRCULAR ROAD WEST, U0132 AILSA ROAD
29/09/2025 09:03:00 : ROADWORKS
U5501, Shamble Lane, Newtownhamilton, - Road Closure, U5501, Shamble Lane, Newtownhamilton
Road closure required to facilitate work by R Heatrick Ltd.
Closure to operate: From 08:00 on Monday 08 December 2025 to 18:00 on Sunday 06 December 2026. Diversion in place, delays expected.
Alternative Route Via:B78 Markethill Road, B78 Cladymilltown Road, B134 Mowhan Road, B134 Tullyah Road.
Closure to operate: From 08:00 on Monday 08 December 2025 to 18:00 on Sunday 06 December 2026. Diversion in place, delays expected.
Alternative Route Via:B78 Markethill Road, B78 Cladymilltown Road, B134 Mowhan Road, B134 Tullyah Road.